Pilot Project for Value-Added Product Development from Solid ...
Pilot Project for Value-Added Product Development from Solid ...
Pilot Project for Value-Added Product Development from Solid ...
Create successful ePaper yourself
Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.
Table SA.13. Predicted Standardized Costs of Composting <strong>Value</strong>-<strong>Added</strong> Facility<br />
when Producing Bagged Soil Amendment <strong>Product</strong>—1-cubic-foot bags<br />
Component Total Cost Annualized Cost<br />
Lot clearing <strong>for</strong> facility $ 5,300.00 $ 789.86<br />
Concrete <strong>for</strong> facility $ 4,500.00 $ 670.63<br />
Miscellaneous facility costs $ 17,441.20 $ 2,599.25<br />
Electric <strong>for</strong> facility $ 5,620.00 $ 837.55<br />
Grinder $ 66,000.00 $ 25,610.21<br />
Mixing and bagging equipment $ 115,000.00 $ 44,683.25<br />
Contractor & Engineering Services & Overhead $ 92,174.18 $ 13,736.67<br />
Total Construction Cost $ 306,035.38 $ 62,725.76<br />
Maintenance Cost $ 6,425.82<br />
Diesel Cost (<strong>for</strong> grinder) $ 66.76<br />
Electric Power Cost $ 395.22<br />
Mixing Materials Cost $ 48,555.00<br />
Bagging Costs $ 138,964.41<br />
Property Taxes $ 1,086.43<br />
Total Operating Cost $ 195,493.64<br />
TOTAL ANNUALIZED COST OF MIXING/BAGGING FACILITY $ 258,219.40<br />
Tables SA.14. through SA17.: Modeling Assumptions, Invoiced Construction Costs,<br />
and Predicted Costs and Returns Summaries <strong>for</strong> Nature Works Organics<br />
Vermicomposting Facility<br />
Table SA.14. Modeling Assumptions <strong>for</strong> the Vermicomposting Facility<br />
<strong>Solid</strong>s separation efficiency 28.62 % of dry solids (mass balance basis)<br />
(Zering and Wohlgenant)<br />
Moisture content of separated solids 77.2 % (Zering and Wohlgenant)<br />
<strong>Solid</strong>s separation rate 1.9 wet tons / 1,000 lbs. SSLW (@ 77.2 %<br />
moisture content) (Zering and Wohlgenant)<br />
Harvesting frequency Twice per year (Binkley)<br />
Processing rate 11,000 pounds (wet weight) of separated solids /<br />
24 hours (Binkley)<br />
Conversion ratio 1 pound of wet weight separated solids : 0.25<br />
pounds of harvested castings<br />
Electricity costs Based on 1 hour / day usage of a 50-HP tractor,<br />
and $5 / day <strong>for</strong> irrigation and lighting<br />
31