Pilot Project for Value-Added Product Development from Solid ...

Pilot Project for Value-Added Product Development from Solid ... Pilot Project for Value-Added Product Development from Solid ...

nrcs.usda.gov
from nrcs.usda.gov More from this publisher
30.08.2013 Views

Table SA.6. Invoiced Construction Costs of Super Soils Composting Value-Added Process-- Equipment (Rice, Campbell) Component Cost Grinder and attachments (Sundance Equipment, LLC) $66,000.00 Mixing and bagging equipment (Horticultural Equipment & $115,000,00 Services, LLC) Total Cost of Grinding, Mixing, and Bagging Equipment $181,000.00 Table SA.7. Summary of Invoiced Construction Costs for the Super Soils “2 nd Generation” Technology Unit Process Cost % of Total Cost Manufacturing facility $32,861.20 15.37% Grinder and attachments $66,000.00 30.85% Mixing and bagging equipment $115,000.00 53.78% Total Invoiced Cost of Super Soils Composting Value-Added Process $213,861.20 100.00% Table SA.8. Predicted Cost Summary for Composting Value-Added Facility when Producing Bulk Soil Amendment Product TOTAL CONSTRUCTION COST OF COMPOSTING VALUE-ADDED FACILITY $ 306,035.38 TOTAL OPERATING COST OF COMPOSTING VALUE-ADDED FACILITY $ 56,529.23 TOTAL ANNUALIZED COSTS OF COMPOSTING VALUE-ADDED FACILITY $ 119,254.99 BREAK-EVEN PRICE FOR BULK SOIL AMENDMENT (MIXING/BAGGING FACILITY ONLY) $ 12.28 / cubic yard BREAK-EVEN PRICE FOR BULK SOIL AMENDMENT (MIXING/BAGGING PLUS EXPANSION 2 COMPOSTING FACILITY) $ 26.32 / cubic yard BREAK-EVEN PRICE FOR BULK SOIL AMENDMENT (MIXING/BAGGING PLUS COMPOSTING FACILITY PLUS SOLIDS SEPARATOR) $ 28.52 / cubic yard 28

Table SA.9. Predicted Standardized Costs of Composting Value-Added Facility when Producing Bulk Soil Amendment Product Component Total Cost Annualized Cost Lot clearing for facility $ 5,300.00 $ 789.86 Concrete for facility $ 4,500.00 $ 670.63 Miscellaneous facility costs $ 17,441.20 $ 2,599.25 Electric for facility $ 5,620.00 $ 837.55 Grinder $ 66,000.00 $ 25,610.21 Mixing and bagging equipment $ 115,000.00 $ 44,683.25 Contractor & Engineering Services & Overhead $ 92,174.18 $ 13,736.67 Total Construction Cost $ 306,035.38 $ 62,725.76 Maintenance Cost $ 6,425.82 Diesel Cost (for grinder) $ 66.76 Electric Power Cost $ 395.22 Mixing Materials Cost $ 48,555.00 Bagging Costs $ 0.00 Property Taxes $ 1,086.43 Total Operating Cost $ 56,529.23 TOTAL ANNUALIZED COST OF MIXING/BAGGING FACILITY $ 119,254.99 Table SA.10. Predicted Cost Summary for Composting Value-Added Facility when Producing Bagged Soil Amendment Product—2-cubic-feet bags TOTAL CONSTRUCTION COST OF COMPOSTING VALUE-ADDED FACILITY $ 306,035.38 TOTAL OPERATING COST OF COMPOSTING VALUE-ADDED FACILITY $ 145,676.55 TOTAL ANNUALIZED COSTS OF COMPOSTING VALUE-ADDED FACILITY $ 208,402.31 BREAK-EVEN PRICE FOR BAGGED (2 CUBIC FEET) SOIL AMENDMENT (MIXING/BAGGING FACILITY ONLY) $ 1.59 / bag BREAK-EVEN PRICE FOR BAGGED (2 CUBIC FEET) SOIL AMENDMENT (MIXING/BAGGING PLUS EXPANSION 2 COMPOSTING FACILITY) $ 2.63 / bag BREAK-EVEN PRICE FOR BAGGED (2 CUBIC FEET) SOIL AMENDMENT (MIXING/BAGGING PLUS COMPOSTING FACILITY PLUS SOLIDS SEPARATOR) $ 2.79 / bag 29

Table SA.6. Invoiced Construction Costs of Super Soils Composting <strong>Value</strong>-<strong>Added</strong><br />

Process-- Equipment (Rice, Campbell)<br />

Component Cost<br />

Grinder and attachments (Sundance Equipment, LLC) $66,000.00<br />

Mixing and bagging equipment (Horticultural Equipment &<br />

$115,000,00<br />

Services, LLC)<br />

Total Cost of Grinding, Mixing, and Bagging Equipment $181,000.00<br />

Table SA.7. Summary of Invoiced Construction Costs <strong>for</strong> the Super Soils “2 nd<br />

Generation” Technology<br />

Unit Process Cost % of Total Cost<br />

Manufacturing facility $32,861.20 15.37%<br />

Grinder and attachments $66,000.00 30.85%<br />

Mixing and bagging equipment $115,000.00 53.78%<br />

Total Invoiced Cost of Super Soils<br />

Composting <strong>Value</strong>-<strong>Added</strong> Process<br />

$213,861.20 100.00%<br />

Table SA.8. Predicted Cost Summary <strong>for</strong> Composting <strong>Value</strong>-<strong>Added</strong> Facility when<br />

Producing Bulk Soil Amendment <strong>Product</strong><br />

TOTAL CONSTRUCTION COST OF COMPOSTING VALUE-ADDED<br />

FACILITY $ 306,035.38<br />

TOTAL OPERATING COST OF COMPOSTING VALUE-ADDED FACILITY $ 56,529.23<br />

TOTAL ANNUALIZED COSTS OF COMPOSTING VALUE-ADDED<br />

FACILITY $ 119,254.99<br />

BREAK-EVEN PRICE FOR BULK SOIL AMENDMENT (MIXING/BAGGING<br />

FACILITY ONLY) $ 12.28 / cubic yard<br />

BREAK-EVEN PRICE FOR BULK SOIL AMENDMENT (MIXING/BAGGING<br />

PLUS EXPANSION 2 COMPOSTING FACILITY) $ 26.32 / cubic yard<br />

BREAK-EVEN PRICE FOR BULK SOIL AMENDMENT (MIXING/BAGGING<br />

PLUS COMPOSTING FACILITY PLUS SOLIDS SEPARATOR) $ 28.52 / cubic yard<br />

28