CFD for Ballast Water & Bio-fouling Management
CFD for Ballast Water & Bio-fouling Management
CFD for Ballast Water & Bio-fouling Management
You also want an ePaper? Increase the reach of your titles
YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.
DOUBLE BOTTOM BALLAST TANK<br />
Geometric Details :<br />
1. Volume of tank = 410 m3 2. Flow rate = 1000 m3 /hr<br />
9.12 m<br />
410 3<br />
3<br />
Tank volume m<br />
τ<br />
= = = 0.<br />
41hrs<br />
= 1476sec<br />
pumping rate 1000m<br />
hr<br />
<strong>CFD</strong> <strong>for</strong> <strong>Ballast</strong> <strong>Water</strong> & <strong>Bio</strong>-<strong>fouling</strong> <strong>Management</strong><br />
30 m<br />
1.5 m