Formal possum monitoring carried out after the aerial gave a post RTC of 7%<br />

over the operational area.<br />

No further Animal Health Board funded work was carried out at Lake Pounui<br />

in 2007/08.<br />

20. Operational results<br />

Below are the results of monthly trap checks:<br />

Month Rat Hedgehog Weasel Cat Ferret Possum Rabbit Magpie Stoat<br />

July 12 1 1 4 2 0 0 0 1<br />

August 11 0 1 2 1 0 0 0 1<br />

September 13 0 1 0 0 1 0 0 0<br />

October 15 9 2 0 0 0 1 0 0<br />

November 11 1 0 0 0 0 0 0 0<br />

December 9 4 0 0 0 0 2 0 0<br />

January 11 7 0 3 0 0 0 0 0<br />

March 10 11 0 1 2 0 0 0 1<br />

May 7 15 0 3 1 0 0 1 0<br />

June 12 6 1 3 0 0 0 0 6<br />

Total 111 54 6 16 6 1 3 1 9<br />

Total amount of Pestoff used was 80kg.<br />

20.1 Monitoring<br />

During February and March 2008 M&I carried out bird count monitoring on<br />

transect lines within part of Lake Pounui catchment. There was no invertebrate<br />

monitoring carried out as this work has been dropped from the monitoring<br />

programme.<br />

21. Discussion<br />

As of preparing this report the Pounui farm and lake are still for sale. There has<br />

been a lot of fencing improvements carried out over the last year. The presence<br />

of feral pigs is still an issue and this will be ongoing.<br />

22. The future<br />

Integrated predator control is planned to continue for the 2008/09 year. The<br />

bird count monitoring lines will be recounted next summer also.<br />

23. Costs<br />

Set out below is a breakdown of costs from <strong>Greater</strong> Wellington’s SAP financial<br />

system up until the end of the financial year 30 June 2008.<br />

Vehicle/plant 2,763.07<br />

Labour 4,247.00<br />

Material/supplies 2,357.73<br />

Total: 9,367.80<br />

PAGE 14 OF 44 WGN_DOCS-#609098-V1<br />

$