Lake Nganoke<br />
9. Executive summary<br />
This is a further updated report for Lake Nganoke for the year 2007/08. It is a<br />
follow on report from the report prepared in 2006/07.<br />
Predator control was carried out for only six months of the year. Other work<br />
activities and the owners request not to service the equipment during the<br />
months of May and June were the main reasons for this operation not receiving<br />
the full 12 monthly maintenance rounds.<br />
10. Recommendations<br />
• Continue to carry on with integrated predator control at Lake Nganoke and<br />
service the sites on a monthly basis or as time permits.<br />
11. Objective<br />
• To reduce predator populations to a level that improves and enhances the<br />
management areas biodiversity values.<br />
12. Operational area<br />
The operational area remains unchanged and still covers the same six hectares<br />
of Lake Nganoke and the adjacent Turanganui wetland.<br />
12.1 Traps and bait stations<br />
Fenn traps and Sentry bait stations continue to be used at Lake Nganoke, but<br />
many were changed during the year as they had exceeded their use-by dates.<br />
Prolonged submerged periods at times of high water had rusted some Fenns,<br />
making then unsuitable for continued use. Bait stations were breaking down<br />
due to over exposure to the suns ultra violet rays.<br />
There are still 16 control sites in place around both wetland areas.<br />
13. Operational results<br />
Operational results are listed on a monthly basis as follows and are valid until<br />
the end of June 2008.<br />
Month Rat Hedgehog Cat Mice<br />
July 0 12 2 0<br />
August 0 4 1 0<br />
November 1 11 0 1<br />
January 2 15 1 0<br />
March 3 8 2 0<br />
April 0 2 1 0<br />
Total 6 52 7 1<br />
Total amount of Pestoff used was 4kg.<br />
WGN_DOCS-#609098-V1 PAGE 11 OF 44