High front guttering advisory committee report - NSW Fair Trading ...
High front guttering advisory committee report - NSW Fair Trading ...
High front guttering advisory committee report - NSW Fair Trading ...
You also want an ePaper? Increase the reach of your titles
YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.
BCA Date of<br />
adoption<br />
in <strong>NSW</strong><br />
BCA 2007 3.5.2.4(d)<br />
Performance<br />
Requirement<br />
ACM (Standard) Acceptable<br />
Construction<br />
Practice<br />
(ACP)<br />
50<br />
Explanatory<br />
information<br />
Comments<br />
Where high-<strong>front</strong>ed gutters are installed, provision must be made to avoid any overflow back into the roof or building structure by installing slotted gutters or the<br />
like.<br />
2008 1 May<br />
2008<br />
2009 1 May<br />
2009<br />
- 3500.3: 2003<br />
New Amdt 1<br />
3500.5: 2000<br />
Amdt 1: 2002<br />
Amdt 2: 2004<br />
Amdt 3: 2006<br />
New Amdt 4<br />
- 3500.3: 2003<br />
Amdt 1<br />
3500.5: 2000<br />
Amdt 1: 2002<br />
Amdt 2: 2004<br />
Amdt 3: 2006<br />
- - Insert Amdt 1 to 3500.3 and Amdt 4 to 3500.5<br />
Changed - Change to ACP 3.5.2.4 to remove reference to<br />
slotted gutters (see below), for consistency<br />
purposes – to align with ACM 3500.3 and 3500.5.