High front guttering advisory committee report - NSW Fair Trading ...
High front guttering advisory committee report - NSW Fair Trading ...
High front guttering advisory committee report - NSW Fair Trading ...
Create successful ePaper yourself
Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.
BCA Date of<br />
adoption<br />
in <strong>NSW</strong><br />
BCA 96<br />
Amdt 5<br />
1 August<br />
1999<br />
Performance<br />
Requirement<br />
Changed<br />
BCA 96 Amdt 4 Performance Requirement P2.2.1:<br />
ACM (Standard) Acceptable<br />
Construction<br />
Practice<br />
(ACP)<br />
48<br />
Explanatory<br />
information<br />
Comments<br />
- - - Performance Requirements ARIs changed (See<br />
below)<br />
(a) Surface water, resulting from a storm having an average recurrence interval of 10 years and which is collected or concentrated by a building or sitework,<br />
must be disposed of in a way that avoids the likelihood of damage or nuisance to any other property.<br />
(b) Surface water, resulting from a storm having an average recurrence interval of 50 years must not enter the building.<br />
BCA 96 Amdt 5 Performance Requirement P2.2.1:<br />
(a) Surface water, resulting from a storm having an average recurrence interval of 20 years and which is collected or concentrated by a building or sitework,<br />
must be disposed of in a way that avoids the likelihood of damage or nuisance to any other property.<br />
(b) Surface water, resulting from a storm having an average recurrence interval of 100 years must not enter the building.<br />
BCA 96 1 January - 3500.3.2: 1998 Changed - New Standard 3500.5 referenced; ACP Table<br />
Amdt 8 2001<br />
Amdt 1: 1998<br />
3.5.2.2 change to reflect reference to 3500.5.<br />
BCA 96<br />
Amdt 12<br />
New 3500.5: 2000<br />
1 Jan 2003 - 3500.3.2: 1998<br />
Amdt 1: 1998<br />
3500.5: 2000<br />
New Amdt 1: 2002<br />
- - Include Amdt 1 to 3500.5