- Page 2 and 3:
3R in Asia a gap analysis in select
- Page 4 and 5:
Rapid economic growth is accompanie
- Page 6 and 7:
ii Reduce, Reuse, Recycle Knowledge
- Page 8 and 9:
iv Acronyms & Abbreviations 3R Redu
- Page 11 and 12:
Foreword Preface Executive Summary
- Page 13 and 14:
Enormous challenges in developing a
- Page 15 and 16:
Country Highlights in Promoting 3R
- Page 17 and 18:
The objective of the analyses was t
- Page 19 and 20:
Strong and Weak represent the level
- Page 21 and 22:
BACKGROUND Bangladesh has a populat
- Page 23 and 24:
HEALTHCARE WASTE Currently, Banglad
- Page 25 and 26:
Recycling ULAB Image source: Waste
- Page 27 and 28:
CURRENT SITUATION OF NATIONAL POLIC
- Page 29 and 30:
BACKGROUND Bhutan is a small landlo
- Page 31 and 32:
Most of the higher value recyclable
- Page 33 and 34:
E-WASTE No published information ex
- Page 35 and 36:
CURRENT SITUATION OF NATIONAL POLIC
- Page 37 and 38:
BACKGROUND Brunei Darussalam or Bru
- Page 39 and 40:
The NCE was established in 1993 by
- Page 41 and 42:
for health settings but the princip
- Page 43 and 44:
CURRENT SITUATION OF NATIONAL POLIC
- Page 45 and 46:
BACKGROUND Cambodia currently has a
- Page 47 and 48:
Findings On-going difficulties in s
- Page 49 and 50:
GAPS FOR IMPLEMENTATION OF 3R World
- Page 51 and 52:
CURRENT SITUATION OF NATIONAL POLIC
- Page 53 and 54:
BACKGROUND Referred as ‘workshop
- Page 55 and 56:
year, an integrated solid waste man
- Page 57 and 58:
• Weak infrastructure of disposal
- Page 59 and 60:
TECHNOLOGY STATUS FOR IMPLEMENTATIO
- Page 61 and 62:
Priorities must be set to implement
- Page 63 and 64:
BACKGROUND Urbanization and uncontr
- Page 65 and 66:
Quantity and characteristics are tw
- Page 67 and 68:
The mandate of the National Task Fo
- Page 69 and 70:
CURRENT SITUATION OF NATIONAL POLIC
- Page 71 and 72:
BACKGROUND Indonesia, with over 18,
- Page 73 and 74:
The Compost Subsidy Project plans t
- Page 75 and 76:
CURRENT SITUATION OF NATIONAL POLIC
- Page 77 and 78:
BACKGROUND Located in the Pacific O
- Page 79 and 80:
Eco-Town at Kitakyushu in Japan The
- Page 81 and 82:
GAPS FOR IMPLEMENTATION OF 3R World
- Page 83 and 84:
CURRENT SITUATION OF NATIONAL POLIC
- Page 85 and 86:
BACKGROUND With a population of abo
- Page 87 and 88:
The Ministry of Environment has bee
- Page 89 and 90: SOURCES AND QUANTITIES OF HEALTHCAR
- Page 91 and 92: The rightful use of appropriate and
- Page 93 and 94: BACKGROUND The Lao People’s Democ
- Page 95 and 96: In the national level, Science, Tec
- Page 97 and 98: Efforts were made by the Government
- Page 99 and 100: CURRENT SITUATION OF NATIONAL POLIC
- Page 101 and 102: BACKGROUND With about 330,000 km 2
- Page 103 and 104: nationwide. Malaysia has plans to s
- Page 105 and 106: and disposal of hazardous waste; in
- Page 107 and 108: CURRENT SITUATION OF NATIONAL POLIC
- Page 109 and 110: BACKGROUND Republic of Philippines
- Page 111 and 112: Recyclable waste transported from t
- Page 113 and 114: Findings About five years ago, the
- Page 115 and 116: CURRENT SITUATION OF NATIONAL POLIC
- Page 117 and 118: BACKGROUND Singapore, an island bet
- Page 119 and 120: Participation by households increas
- Page 121 and 122: Standards Board (now the National S
- Page 123 and 124: Presently, the country relies predo
- Page 125 and 126: BACKGROUND Thailand is one of the n
- Page 127 and 128: Findings Appropriate policies and e
- Page 129 and 130: In the industrial sector, e-waste i
- Page 131 and 132: CURRENT SITUATION OF NATIONAL POLIC
- Page 133 and 134: BACKGROUND In recent decades, Vietn
- Page 135 and 136: opportunity for waste recycling bus
- Page 137 and 138: Findings There is a need to develop
- Page 139: TECHNOLOGY STATUS FOR IMPLEMENTATIO
- Page 143 and 144: chapter 4 Conclusions & Recommendat
- Page 145 and 146: ABC news, ‘ E-waste China’ (200