28.08.2013 Views

Evaluation of Plastic Waste Management in Thailand Using Material ...

Evaluation of Plastic Waste Management in Thailand Using Material ...

Evaluation of Plastic Waste Management in Thailand Using Material ...

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

Table E-9 Details <strong>of</strong> each flow <strong>of</strong> scenario 3 (cont<strong>in</strong>ued)<br />

No. Description<br />

Value<br />

(Tonnes/year)<br />

42 Landfill<strong>in</strong>g 885,793<br />

43 Stock <strong>in</strong> landfill 836,929 Stock = <strong>in</strong>put <strong>of</strong> process - output <strong>of</strong> process<br />

44 <strong>Plastic</strong> waste for recycl<strong>in</strong>g 498,546<br />

45<br />

46<br />

47<br />

Actual plastic waste for<br />

recycl<strong>in</strong>g<br />

Improper disposed waste<br />

(Thermosett<strong>in</strong>g)<br />

Improper disposed waste<br />

(Thermoplastic)<br />

733,282<br />

10,196<br />

222,999<br />

231<br />

Assumption and Calculation<br />

The summary <strong>of</strong> landfill<strong>in</strong>g plastic wastes from each source. This amount is from<br />

municipal and <strong>in</strong>dustrial wastes for landfill<strong>in</strong>g.<br />

Assumed that 14% <strong>of</strong> municipal thermoplastic wastes will recycled <strong>in</strong> 2016. This<br />

amount is from municipal and <strong>in</strong>dustrial wastes for recycl<strong>in</strong>g.<br />

Assumed that 24% <strong>of</strong> municipal waste for recycl<strong>in</strong>g will be recycled <strong>in</strong> 2016. (14% <strong>of</strong><br />

material recycl<strong>in</strong>g and 10% <strong>of</strong> feedstock recycl<strong>in</strong>g)<br />

Assumed that 43% <strong>of</strong> municipal thermosett<strong>in</strong>g wastes will not disposed properly (Not<br />

present <strong>in</strong> the material flow)<br />

Assumed that 9.5% <strong>of</strong> municipal thermoplastic wastes will not disposed properly (Not<br />

present <strong>in</strong> the material flow)<br />

48 Improper disposed waste 233,195 The summary <strong>of</strong> undisposed municipal wastes from each source<br />

49 Stock <strong>in</strong> environment 496,648 Stock = Uncollected waste + Improper disposed waste<br />

Municipal <strong>in</strong>c<strong>in</strong>eration process<br />

50<br />

51<br />

Off-gas (1) from municipal<br />

<strong>in</strong>c<strong>in</strong>eration<br />

Residue waste (1) from<br />

municipal <strong>in</strong>c<strong>in</strong>eration<br />

Industrial <strong>in</strong>c<strong>in</strong>eration process<br />

Industrial <strong>in</strong>c<strong>in</strong>eration<br />

52<br />

(cement)<br />

53<br />

Off-gas (2) from <strong>in</strong>dustrial<br />

<strong>in</strong>c<strong>in</strong>eration<br />

213,397<br />

Assumed that 90% <strong>of</strong> <strong>of</strong>f-gas generation will be generated <strong>in</strong> municipal <strong>in</strong>c<strong>in</strong>eration <strong>in</strong><br />

2016<br />

23,711 Assumed that 10% <strong>of</strong> residue waste will be generated <strong>in</strong> municipal <strong>in</strong>c<strong>in</strong>eration <strong>in</strong> 2016.<br />

300,000<br />

Assumed that 300,000 tonnes <strong>of</strong> landfilled plastic wastes will be produced RDF and<br />

burnt <strong>in</strong> the cement kiln <strong>in</strong> 2016.<br />

2,157,907 Assumed that 90% <strong>of</strong> <strong>of</strong>f-gas generation will be generated <strong>in</strong> <strong>in</strong>dustrial <strong>in</strong>c<strong>in</strong>eration

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!