27.08.2013 Views

Ethernet Configuration and Control, cont'd - Extron Electronics

Ethernet Configuration and Control, cont'd - Extron Electronics

Ethernet Configuration and Control, cont'd - Extron Electronics

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

Reduced air flow — Installation of the equipment in a rack should be such<br />

that the amount of air flow required for safe operation of the equipment is not<br />

compromised.<br />

Mechanical loading — Mounting of the equipment in the rack should be such<br />

that a hazardous condition is not created due to uneven mechanical loading.<br />

Circuit overloading — Consideration should be given to the connection of the<br />

equipment to the supply circuit <strong>and</strong> the effect that overloading of the circuits<br />

might have on overcurrent protection <strong>and</strong> supply wiring. Appropriate<br />

consideration of equipment nameplate ratings should be used when<br />

addressing this concern.<br />

Reliable earthing (grounding) — Reliable earthing of rack-mounted<br />

equipment should be maintained. Particular attention should be given to<br />

supply connections other than direct connections to the branch circuit (e.g.<br />

use of power strips.<br />

Rack mounting procedure<br />

To mount the PC1 on a rack shelf,<br />

1. If rubber feet have been installed on the bottom of the unit, remove them.<br />

2. Mount the PC1 on the rack shelf, using two 4-40 x 3/16" screws in opposite<br />

(diagonal) corners of the unit to secure it to the shelf.<br />

3. Attach a blank panel or other unit(s) to the rack shelf.<br />

RSU 129<br />

1U Universal Rack Shelf<br />

Both front false faceplates<br />

use 2 screws.<br />

Use 2 mounting holes on<br />

opposite corners.<br />

1/2 Rack Width Front False<br />

Faceplate<br />

1/4 Rack Width Front False<br />

Faceplate<br />

(2) 4-40 x 3/16"<br />

Screws<br />

Mounting the IPL T PC1 on an RSU 129 Universal rack shelf<br />

4. Insert the shelf into the rack, aligning the holes in the shelf with those in the<br />

rack.<br />

5. Secure the shelf to the rack using the supplied machine screws. This shelf can<br />

be mounted in the front or in the rear of the rack.<br />

IPL T PC1 Installation <strong>and</strong> Rear Panel<br />

2-3<br />

PRELIMINARY

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!