EUROPEAN ATHLETICS Brand Design Manual
EUROPEAN ATHLETICS Brand Design Manual
EUROPEAN ATHLETICS Brand Design Manual
Create successful ePaper yourself
Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.
5 vEnUE DREssing<br />
European Mountain Running Championships<br />
start and finish gantries<br />
The LOC is responsible for providing the start line and finish line<br />
gantry structure and branding for the European Cup Race Walking.<br />
Owing to the complexity of this structure, the LOC should engage<br />
a specialist organisation to provide the basic structure. It is the<br />
LOC’s responsibility to ensure that the structure meets IAAF rules<br />
and regulations, as well as safety standards.<br />
the span of the start gantry<br />
shall be such as to accommodate the number of athletes for a mass<br />
start. This will be conditioned to the number of foreseen athletes<br />
per event and to the existing space. The optimal (preferred) span<br />
for a mass start is 1m per 5 starters (example: 50 starters require a<br />
10m span). The minimum span for a mass start must be 1m per 10<br />
starters.<br />
For the mountain running events, when the space permits the use<br />
of starting boxes, the span must be such as to provide 1m for each<br />
complete team and additional 1m boxes for individual entries, placing<br />
no more than four athletes in each box.<br />
the span of the finish gantry<br />
shall have the following dimensions: 8m x 0.95m<br />
Outside towers(x 6): 1.525m x 5.768m (to the top of span).<br />
Inside towers (x 2): 1.525m x .85 m (to bottom of span).<br />
The European Athletics signage company can be asked for a quote<br />
for any venue dressing/signage elements.<br />
START <strong>EUROPEAN</strong> MOUNTAIN RUNNING CHAMPIONSHIPS START<br />
Cauterets2007<br />
NATIONAL<br />
PARTNE R<br />
LOGOTYPE<br />
NATIONAL<br />
PARTNE R<br />
LOGOTYPE<br />
NATIONAL<br />
PARTNE R<br />
LOGOTYPE<br />
NATIONAL NATIONAL<br />
PARTNE R<br />
PARTNE R<br />
LOGOTYPE LOGOTYPE<br />
INSTITUTIO N INSTITUTIO N INSTITUTIO N<br />
LOGOTYPE LOGOTYPE LOGOTYPE<br />
Example of start and finish gantry.<br />
NATIONAL<br />
PARTNE R<br />
LOGOTYPE<br />
NATIONAL<br />
PARTNE R<br />
LOGOTYPE<br />
NATIONAL<br />
PARTNE R<br />
LOGOTYPE<br />
NATIONAL NATIONAL<br />
PARTNE R<br />
PARTNE R<br />
LOGOTYPE LOGOTYPE<br />
INSTITUTIO N INSTITUTIO N INSTITUTIO N<br />
LOGOTYPE LOGOTYPE LOGOTYPE<br />
FINISH <strong>EUROPEAN</strong> MOUNTAIN RUNNING CHAMPIONSHIPS FINISH<br />
NATIONAL<br />
PARTNE R<br />
LOGOTYPE<br />
NATIONAL<br />
PARTNE R<br />
LOGOTYPE<br />
NATIONAL<br />
PARTNE R<br />
LOGOTYPE<br />
NATIONAL NATIONAL<br />
PARTNE R<br />
PARTNE R<br />
LOGOTYPE LOGOTYPE<br />
INSTITUTIO N INSTITUTIO N INSTITUTIO N<br />
LOGOTYPE LOGOTYPE LOGOTYPE<br />
Cauterets2007<br />
NATIONAL<br />
PARTNE R<br />
LOGOTYPE<br />
NATIONAL<br />
PARTNE R<br />
LOGOTYPE<br />
NATIONAL<br />
PARTNE R<br />
LOGOTYPE<br />
NATIONAL NATIONAL<br />
PARTNE R<br />
PARTNE R<br />
LOGOTYPE LOGOTYPE<br />
INSTITUTIO N INSTITUTIO N INSTITUTIO N<br />
LOGOTYPE LOGOTYPE LOGOTYPE