ETA-10-0423-ATS evo - Etanco
ETA-10-0423-ATS evo - Etanco
ETA-10-0423-ATS evo - Etanco
Create successful ePaper yourself
Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.
Page 12 of <strong>ETA</strong>-<strong>10</strong>/<strong>0423</strong>, issued on 13.12.20<strong>10</strong>, English translation prepared by ZAG<br />
Table 3: Installation data<br />
Anchor size M6 M8 M<strong>10</strong> M12 M16<br />
Nominal drill hole diameter d0 [mm] <strong>10</strong> 12 15 18 24<br />
Cutting diameter of drill bit dcut ≤ [mm] <strong>10</strong>,45 12,50 15,5 18,5 24,55<br />
Depth of drill hole h1 ≥ [mm] 75 85 95 115 130<br />
Minimum installation depth hnom ≥ [mm] 60 70 80 <strong>10</strong>0 115<br />
Effective anchorage depth hef [mm] 49 59 67 88 99<br />
Diameter of clearance hole in the fixture df ≤ [mm] 12 14 17 20 26<br />
Length of the anchor L [mm] tfix + 60 tfix + 70 tfix + 80 tfix + <strong>10</strong>0 tfix + 115<br />
Torque moment Tinst [Nm] <strong>10</strong> 20 45 80 150<br />
Table 4: Minimum thickness of concrete member spacing, and edge distances<br />
Anchor size M6 M8 M<strong>10</strong> M12 M16<br />
Minimum thickness of the concrete member hmin [mm] <strong>10</strong>0 120 140 180 200<br />
Minimum spacing<br />
Minimum edge distance<br />
<strong>ATS</strong> <strong>evo</strong><br />
Installation data<br />
smin [mm] 50 60 70 80 <strong>10</strong>0<br />
for c [mm] ≥ 75 90 <strong>10</strong>0 150 200<br />
cmin [mm] 50 60 70 80 <strong>10</strong>0<br />
for s ≥ [mm] 75 90 <strong>10</strong>0 150 200<br />
Annex 4<br />
of the European Technical<br />
Approval<br />
<strong>ETA</strong>–<strong>10</strong>/<strong>0423</strong>