24.08.2013 Views

ETA-10-0423-ATS evo - Etanco

ETA-10-0423-ATS evo - Etanco

ETA-10-0423-ATS evo - Etanco

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

Page 12 of <strong>ETA</strong>-<strong>10</strong>/<strong>0423</strong>, issued on 13.12.20<strong>10</strong>, English translation prepared by ZAG<br />

Table 3: Installation data<br />

Anchor size M6 M8 M<strong>10</strong> M12 M16<br />

Nominal drill hole diameter d0 [mm] <strong>10</strong> 12 15 18 24<br />

Cutting diameter of drill bit dcut ≤ [mm] <strong>10</strong>,45 12,50 15,5 18,5 24,55<br />

Depth of drill hole h1 ≥ [mm] 75 85 95 115 130<br />

Minimum installation depth hnom ≥ [mm] 60 70 80 <strong>10</strong>0 115<br />

Effective anchorage depth hef [mm] 49 59 67 88 99<br />

Diameter of clearance hole in the fixture df ≤ [mm] 12 14 17 20 26<br />

Length of the anchor L [mm] tfix + 60 tfix + 70 tfix + 80 tfix + <strong>10</strong>0 tfix + 115<br />

Torque moment Tinst [Nm] <strong>10</strong> 20 45 80 150<br />

Table 4: Minimum thickness of concrete member spacing, and edge distances<br />

Anchor size M6 M8 M<strong>10</strong> M12 M16<br />

Minimum thickness of the concrete member hmin [mm] <strong>10</strong>0 120 140 180 200<br />

Minimum spacing<br />

Minimum edge distance<br />

<strong>ATS</strong> <strong>evo</strong><br />

Installation data<br />

smin [mm] 50 60 70 80 <strong>10</strong>0<br />

for c [mm] ≥ 75 90 <strong>10</strong>0 150 200<br />

cmin [mm] 50 60 70 80 <strong>10</strong>0<br />

for s ≥ [mm] 75 90 <strong>10</strong>0 150 200<br />

Annex 4<br />

of the European Technical<br />

Approval<br />

<strong>ETA</strong>–<strong>10</strong>/<strong>0423</strong>

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!