ENVIRONMENTAL SCOPING REPORT FOR THE PROPOSED 40MW OPEN CYCLE GAS TURBINE POWER<br />

PLANT IN THE AMERSFOORT AREA, MPUMALANGA<br />

Bohlweki-SSI Environmental<br />

Table 11.3: Key milestones of the programme for the EIA phase of the<br />

project<br />

KEY MILESTONE ACTIVITY PROPOSED<br />

DATE<br />

COMPLETION<br />

Undertake further public participation – public<br />

meetings and focus group meetings,<br />

October 2009<br />

Finalisation of Environmental Scoping Report November 2009<br />

DW&EA acceptance of the Environmental Scoping<br />

Report and Plan of Study to undertake the<br />

Environmental Impact Assessment<br />

Mid-January 2010<br />

Undertake detailed specialist studies November 2009 – January 2010<br />

Compile draft EIA Report and draft EMP November 2009 – March 2010<br />

Making draft EIA Report and draft EMP available<br />

to the public, stakeholders and authorities<br />

March – April 2010<br />

Submit final EIA Report and EMP to authorities April 2010<br />

Authority review period April – August 2010<br />

Issuing of authorisation (positive or negative) Mid-August 2010<br />

Notify I&APs of authorisation Mid-August 2010<br />

11.10. Environmental Study Team<br />

Details of the environmental study team and their fields of specialisation are provided<br />

in Table 11.4 below.<br />

Table 11.4 Proposed specialist team and their areas of expertise<br />

NAME AND ORGANISATION<br />

SPECIALIST STUDY TO BE<br />

UNDERTAKEN DURING EIA PHASE<br />

Malcolm Roods - Bohlweki-SSI Project Director for the EIA process;<br />

Environmental<br />

review and quality control of EIA<br />

process documentation.<br />

Prashika Reddy - Bohlweki-SSI Project Manager for the EIA process.<br />

Environmental<br />

Management of specialist team.<br />

Compilation of all project<br />

documentation; assistance in public<br />

participation.<br />

Sibongile Hlomuka - Bohlweki-SSI Project Manager for the public<br />

Environmental<br />

participation process.<br />

Yolisa Zokufa - Bohlweki-SSI Environmental Assistance with the public participation<br />

process.<br />

Reinie Meyer - Private Peer review of geohydrology<br />

Chris Waygood – Jones and Wagner<br />

assessment<br />

Peer review of hydrology assessment<br />

Paul da Cruz – SiVEST Wetland delineation study<br />

Dr Johan van der Waals - Terra Soil Science Soils and Agricultural Potential<br />

Riaan Robbeson and Dewald Kamfer - Ecological assessment (flora and fauna)<br />

Bathusi Environmental Consulting (BEC)<br />

E02.JNB.000308<br />

ESKOM HOLDINGS LIMITED<br />

01<br />

123<br />

08/10/2009