ENVIRONMENTAL SCOPING REPORT FOR THE PROPOSED 40MW OPEN CYCLE GAS TURBINE POWER<br />

PLANT IN THE AMERSFOORT AREA, MPUMALANGA<br />

Bohlweki-SSI Environmental<br />

• a description and comparative assessment of all alternatives identified during the<br />

environmental impact assessment process;<br />

• a summary of the findings and recommendations of any specialist report or<br />

report on a specialised process;<br />

• a description of all environmental issues that were identified during the<br />

environmental impact assessment process, an assessment of the significance of<br />

each issue and an indication of the extent to which the issue could be addressed<br />

by the adoption of mitigation measures;<br />

• an assessment of each identified potentially significant impact, including –<br />

i) cumulative impacts;<br />

ii) the nature of the impact;<br />

iii) the extent and duration of the impact;<br />

iv) the probability of the impact occurring;<br />

v) the degree to which the impact can be reversed;<br />

vi) the degree to which the impact may cause irreplaceable loss of resources;<br />

and<br />

vii) the degree to which the impact can be mitigated;<br />

• a description of any assumptions, uncertainties and gaps in knowledge;<br />

• an opinion as to whether the activity should or should not be authorised,<br />

• an environmental impact statement which contains –<br />

i) a summary of the key findings of the environmental impact assessment; and<br />

ii) a comparative assessment of the positive and negative implications of the<br />

proposed activity and identified alternatives;<br />

• a draft environmental management plan;<br />

• copies of any specialist reports and reports on specialised processes; as well as<br />

• any specific information that may be required by the competent authority.<br />

11.3. Detailed Specialist Studies to be undertaken as part of the EIA<br />

As required in the EIA process, a suite of specialist studies (each study undertaken<br />

by a specialist in that field) were proposed due to identified potential significant<br />

impacts on the environment. As part of the Scoping exercise, the team of specialists<br />

attended site visits and specialist discussions/workshop to ensure the scope of each<br />

specialist study was presented as accurate as possibly. The outcome of the<br />

discussions/workshop was the need to further investigate all identified issues into the<br />

EIA phase as best-practice and a means to fully understand their implications.<br />

Each of the specialists involved has extensive experience in their field to undertake<br />

the proposed detail of studies. Curriculum Vitae of the specialist team are available<br />

on request.<br />

A description of each proposed specialist study and its Terms of Reference are<br />

provided below.<br />

E02.JNB.000308<br />

ESKOM HOLDINGS LIMITED<br />

01<br />

111<br />

08/10/2009