ENVIRONMENTAL SCOPING REPORT FOR THE PROPOSED 40MW OPEN CYCLE GAS TURBINE POWER PLANT IN THE AMERSFOORT AREA, MPUMALANGA<br />

Bohlweki-SSI Environmental<br />

ISSUE AREA OF POTENTIAL IMPACT RECOMMENDATIONS<br />

Noise Potential noise impacts consist of the following: No noise impact assessment will be conducted in<br />

the EIA phase as the potential noise impacts during<br />

• Impacts on the residual (existing) noise climate. the construction and operational phases are<br />

• Predicted noise climate – pre-construction phase. considered to be of low significance. Appropriate<br />

• Predicted noise climate – construction phase. mitigation measures will be proposed in the EMP.<br />

• Predicted noise climate – operational phase<br />

־ OCGT power plant.<br />

־ OCGT power plant generated traffic.<br />

E02.JNB.000308<br />

ESKOM HOLDINGS LIMITED<br />

01<br />

107<br />

08/10/2009