24.08.2013 Views

Part 2 - Eskom

Part 2 - Eskom

Part 2 - Eskom

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

ENVIRONMENTAL SCOPING REPORT FOR THE PROPOSED 40MW OPEN CYCLE GAS TURBINE POWER PLANT IN THE AMERSFOORT AREA, MPUMALANGA<br />

ISSUE AREA OF POTENTIAL IMPACT RECOMMENDATIONS<br />

to be large and as such the activities can impact<br />

negatively on the low intensity land use of<br />

extensive grazing.<br />

Biodiversity The following impacts/issues were identified that could<br />

affect the floristic and faunal attributes of the study<br />

area adversely:<br />

• Potential impacts on the local and regional<br />

biodiversity;<br />

• Potential impacts on sensitive/pristine habitat<br />

types;<br />

• Potential impacts on threatened/protected species<br />

and habitat;<br />

• Potential impacts on surrounding habitat and<br />

species; and<br />

• Potential impacts on fauna species.<br />

Impacts of a cumulative nature include:<br />

• Potential increase in habitat transformation (e.g.<br />

loss of habitat);<br />

• Potential increase in habitat fragmentation (e.g.<br />

loss of migratory routes); and<br />

• Potential increase in environmental degradation<br />

(e.g. loss of habitat quality).<br />

Bohlweki-SSI Environmental<br />

A detailed assessment of the study area will be<br />

undertaken within the EIA phase in order to<br />

adequately assess the potential impacts on<br />

biodiversity as a result of the proposed project and<br />

recommend appropriate mitigation measures,<br />

where required.<br />

E02.JNB.000308<br />

ESKOM HOLDINGS LIMITED<br />

01<br />

101<br />

08/10/2009

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!