ENVIRONMENTAL SCOPING REPORT FOR THE PROPOSED 40MW OPEN CYCLE GAS TURBINE POWER PLANT IN THE AMERSFOORT AREA, MPUMALANGA<br />

ISSUE AREA OF POTENTIAL IMPACT RECOMMENDATIONS<br />

residual impacts resulting from the improper<br />

decommissioning of the plant and associated<br />

infrastructure or lack of removal of any potential<br />

pollutants related to the processes of the plant<br />

that may over time enter the water cycle.<br />

Soils and Agricultural<br />

Potential<br />

• The soils found on the site of the proposed <strong>Eskom</strong><br />

UCG project are mainly restricted to structured<br />

soils of shallow to variable depth. The main land<br />

use is grassland used for extensive grazing. A<br />

limited area is used for dryland agriculture and the<br />

agricultural potential of these areas is relatively low<br />

due to the dominance of structured and limited<br />

depth soils.<br />

• The proposed mining process will impact large<br />

areas but soil conditions will not be altered<br />

drastically due to the characteristics of the soils. In<br />

the case of swelling soils their self-mulching nature<br />

will lead to the disappearance of small<br />

disturbances over time. It is anticipated that the<br />

grazing potential of the impacted areas will be<br />

negatively impacted but it is possible that this<br />

potential will improve with time as the signs of<br />

impacts fade.<br />

• The overall impacts on soils and agricultural<br />

potential are considered to be low due to a low<br />

baseline. However, the impact area is considered<br />

Bohlweki-SSI Environmental<br />

A detailed assessment of the study area will be<br />

undertaken within the EIA phase in order to<br />

adequately assess the potential impacts on soils<br />

and agricultural potential as a result of the<br />

proposed project and recommend appropriate<br />

mitigation measures, where required.<br />

E02.JNB.000308<br />

ESKOM HOLDINGS LIMITED<br />

01<br />

100<br />

08/10/2009