ENVIRONMENTAL SCOPING REPORT FOR THE PROPOSED 40MW OPEN CYCLE GAS TURBINE POWER PLANT IN THE AMERSFOORT AREA, MPUMALANGA<br />

ISSUE AREA OF POTENTIAL IMPACT RECOMMENDATIONS<br />

Wetlands • If associated infrastructure is located within a<br />

wetland, then the assumption has been made that<br />

the wetland is likely to be completely transformed,<br />

resulting in the complete loss of wetland habitat as<br />

well as functionality of the affected part of the<br />

wetland (and possibly the functionality of the<br />

downstream portion of the wetland).<br />

• Construction-related impacts:<br />

־ General construction related impacts.<br />

־ Impacts related to mining areas.<br />

־ Impacts related to pipelines.<br />

־ Impacts related to access roads.<br />

־ Impacts related to power lines.<br />

• Operation-related impacts:<br />

־ Impacts related to mining areas.<br />

־ Impacts related to pipelines.<br />

־ Impacts related to access roads.<br />

־ Impacts associated with polluted runoff water.<br />

־ Water treatment infrastructure.<br />

־ Impacts related to power lines<br />

• Decommissioning impacts:<br />

־ The potential impacts on wetlands related to<br />

the decommissioning of the plant and proposed<br />

infrastructure are similar in many aspects to<br />

construction-related impacts, if infrastructure<br />

such as buildings is physically removed.<br />

• Post-closure impacts:<br />

־ Potential post-closure impacts would equate to<br />

Bohlweki-SSI Environmental<br />

More detail regarding the layout of the proposed<br />

plant is required to be provided for further, more<br />

detailed assessment and identification of potential<br />

impacts associated with the proposed plant and<br />

required mitigation measures in the EIA phase.<br />

If alignments of proposed linear infrastructure are<br />

provided for assessment, these could be able to be<br />

assessed in terms of their potential impact upon<br />

wetlands, and any design or re-alignment<br />

considerations that will need to be considered in<br />

order to mitigate or reduce the impact.<br />

A detailed on-site delineation and assessment of<br />

the wetlands occurring in certain parts of the study<br />

site where verification of wetland/hydromorphic soil<br />

existence is required will need to be undertaken as<br />

part of the EIA studies.<br />

E02.JNB.000308<br />

ESKOM HOLDINGS LIMITED<br />

01<br />

99<br />

08/10/2009