ENVIRONMENTAL SCOPING REPORT FOR THE PROPOSED 40MW OPEN CYCLE GAS TURBINE POWER<br />

PLANT IN THE AMERSFOORT AREA, MPUMALANGA<br />

10. CONCLUSIONS AND RECOMMENDATIONS<br />

Bohlweki-SSI Environmental<br />

This Environmental Scoping Study (ESS) for the proposed establishment of a 40 MW<br />

open cycle gas turbine (OCGT) power plant has been undertaken in accordance with<br />

the Environmental Impact Assessment Regulations (2006) published in Government<br />

Notice R385 to R387 of 21 April 2006 in terms of Section 24(5), read with Section 44,<br />

of the National Environmental Management Act, 1998 (Act No. 107 of 1998)<br />

In line with Regulation 29 (Chapter 3) of the EIA Regulations, this issues-based ESS<br />

aimed to identify and provide:<br />

• A description of the proposed activity and of any feasible and reasonable<br />

alternatives that have been considered as part of the Scoping Process;<br />

• A description of the environment that may be affected by the activity and the<br />

manner in which the physical, biological, social, economic and cultural aspects of<br />

the environment may be affected by the proposed activity;<br />

• The identification of all legislation and guidelines applicable to the proposed<br />

project;<br />

• A description of environmental issues and potential impacts, including cumulative<br />

impacts, that have been identified;<br />

• Details of the public participation process conducted to date; and<br />

• A plan of study for environmental impact assessment (PoS for EIA) including the<br />

methodology that will be adopted in assessing the potential impacts that have<br />

been identified, including specialist studies or specialised processes that will be<br />

undertaken.<br />

The conclusions and recommendations of this Scoping Study and Report are the<br />

result of both desk-top studies and on-site inspections conducted by the<br />

environmental specialist team.<br />

10.1. Potential Environmental Impacts Identified in the Scoping Study<br />

A summary of the potentially significant issues associated with the proposed 40MW<br />

OCGT power plant, identified within the Environmental Scoping Study, is provided in<br />

Table 10.1 overleaf. Specialist input was received for the following disciplines:<br />

Geohydrology; Hydrology; Wetlands; Soils and Agricultural Potential; Biodiversity;<br />

Social; Air Quality; Visual; Micro-economic; Heritage and Noise. The area of potential<br />

impact and recommendations for investigations to be undertaken within the EIA<br />

phase are also specified.<br />

E02.JNB.000308<br />

ESKOM HOLDINGS LIMITED<br />

01<br />

96<br />

08/10/2009