ENVIRONMENTAL SCOPING REPORT FOR THE PROPOSED 40MW OPEN CYCLE GAS TURBINE POWER PLANT IN THE AMERSFOORT AREA, MPUMALANGA<br />

GEOGRAPHICAL CHANGE PROCESSES<br />

Bohlweki-SSI Environmental<br />

Expected Change Process Yes No Expected Impact Project Phase Status<br />

for change in land use in the area? (2100MW CCGT). In such a case,<br />

the presence of an OCGT plant and<br />

its associated infrastructure might<br />

prohibit future developments<br />

encroaching upon the plant footprint<br />

or pipeline servitudes, which means<br />

that land is lost for development and<br />

mining will be extended over these<br />

areas.<br />

Neutral<br />

E02.JNB.000308<br />

ESKOM HOLDINGS LIMITED<br />

01<br />

75<br />

08/10/2009