Environmental Impact Assessment for the proposed construction of a 400 kV Transmission power line<br />

between Mercury Substation and Ferrum Substation traversing the Free State, North West and<br />

Northern Cape Provinces<br />

Figure <strong>2.</strong>5: Example of Bushclearing around a Transmission power line tower<br />

Figure <strong>2.</strong>6: Example of vegetation clearing within the servitude of a<br />

Transmission power line<br />

Table <strong>2.</strong>1: Minimum standards to be used for vegetation clearing for the<br />

construction of a new Transmission power line<br />

Item Standard Follow up<br />

Centre line of the<br />

proposed<br />

Transmission<br />

power line<br />

Clear to a maximum (depending on tower<br />

type and voltage) of a 4-8m wide strip of<br />

all vegetation along the centre line.<br />

Vegetation to be cut flush with the<br />

ground. Treat stumps with herbicide.<br />

Re-growth shall be cut<br />

within 100 mm of the<br />

ground and treated with<br />

herbicide, as necessary.<br />

Technical Details 2-5 16/04/2007