Environmental Impact Assessment for the proposed construction of a 400 kV Transmission power line<br />
between Mercury Substation and Ferrum Substation traversing the Free State, North West and<br />
Northern Cape Provinces<br />
Figure <strong>2.</strong>3: Diagrammatic representation of a self-supporting tower<br />
<strong>2.</strong><strong>2.</strong>2 Servitude Requirements and Clearances<br />
A permanent servitude will be registered against the title deeds of the properties<br />
that the proposed Transmission power line is proposed to traverse.<br />
The permanent servitude width for a 400 kV Transmission power line is 55 m, i.e.<br />
27.5 m on either side of the centre line and 10 m from any anchor. The servitude<br />
is required to ensure the safe construction, maintenance and operation of the<br />
power line, and thereby entitles <strong>Eskom</strong> Transmission Division certain rights, such<br />
as unrestricted access and right of way (ROW).<br />
Where 400 kV Transmission power lines are constructed in parallel, a minimum<br />
separation distance of 55 m is required in order to ensure the reliable operation of<br />
both lines. The minimum vertical clearance to buildings, poles and structures not<br />
forming part of the power line must be 5.6 m. The conductor ground clearance<br />
between the towers is generally 8.1 m. Any farming activities can be practised<br />
underneath the power line, providing that safe working clearances and building<br />
restrictions are adhered to under all circumstances; this applies to all farming<br />
activities except the farming sugar cane and commercial trees.<br />
The minimum distance of a 400 kV Transmission power line structure from<br />
proclaimed public roads is 95 m from the centre line of the structure to the centre<br />
Technical Details 2-3 16/04/2007