Environmental Impact Assessment for the proposed construction of a 400 kV Transmission power line<br />

between Mercury Substation and Ferrum Substation traversing the Free State, North West and<br />

Northern Cape Provinces<br />

Figure <strong>2.</strong>3: Diagrammatic representation of a self-supporting tower<br />

<strong>2.</strong><strong>2.</strong>2 Servitude Requirements and Clearances<br />

A permanent servitude will be registered against the title deeds of the properties<br />

that the proposed Transmission power line is proposed to traverse.<br />

The permanent servitude width for a 400 kV Transmission power line is 55 m, i.e.<br />

27.5 m on either side of the centre line and 10 m from any anchor. The servitude<br />

is required to ensure the safe construction, maintenance and operation of the<br />

power line, and thereby entitles <strong>Eskom</strong> Transmission Division certain rights, such<br />

as unrestricted access and right of way (ROW).<br />

Where 400 kV Transmission power lines are constructed in parallel, a minimum<br />

separation distance of 55 m is required in order to ensure the reliable operation of<br />

both lines. The minimum vertical clearance to buildings, poles and structures not<br />

forming part of the power line must be 5.6 m. The conductor ground clearance<br />

between the towers is generally 8.1 m. Any farming activities can be practised<br />

underneath the power line, providing that safe working clearances and building<br />

restrictions are adhered to under all circumstances; this applies to all farming<br />

activities except the farming sugar cane and commercial trees.<br />

The minimum distance of a 400 kV Transmission power line structure from<br />

proclaimed public roads is 95 m from the centre line of the structure to the centre<br />

Technical Details 2-3 16/04/2007