Environmental Impact Assessment for the proposed construction of a 400 kV Transmission power line<br />

between Mercury Substation and Ferrum Substation traversing the Free State, North West and<br />

Northern Cape Provinces<br />

expensive to construct. Therefore, Transmission power line routes are planned<br />

with as few bends as possible.<br />

Figure <strong>2.</strong>1: Diagrammatic representation of the cross-rope suspension tower<br />

Figure <strong>2.</strong>2: Diagrammatic representation of a compact cross rope<br />

Technical Details 2-2 16/04/2007