Non-Local Authority & Local Authority Urban Tariffs<br />

cont<strong>in</strong>ued...<br />

TOU electricity tariff <strong>for</strong> urban p customers with an NMD from 25 kVA up to 5 MVA, characterised by:<br />

· seasonally and time-of-use differentiated c/kWh Active Energy Charges (which <strong>in</strong>clude network costs) based on the<br />

supply voltage and the transmission zone.<br />

· three time-of-use periods namely Peak, Standard and Off-Peak Periods.<br />

· a R/kVA/month (Network Access Charge) bundled Transmission Network and Distribution Network Access Charge<br />

based on the supply voltage, the transmission zone and the utilised capacity applicable dur<strong>in</strong>g all time periods.<br />

· no Network Demand Charge – <strong>in</strong>cluded <strong>in</strong> the active energy charges.<br />

· a c/kvarh Reactive Energy Charge supplied <strong>in</strong> excess of 30 % (0,96 PF) of the kWh recorded dur<strong>in</strong>g the entire bill<strong>in</strong>g<br />

period. The excess reactive energy is determ<strong>in</strong>ed us<strong>in</strong>g the bill<strong>in</strong>g period totals and will only be applicable dur<strong>in</strong>g<br />

high-demand season.<br />

· a c/kWh Electrification and Rural Subsidy contribution to cross-subsidies to rural and Homelight tariffs, applied to the total<br />

active energy supplied <strong>in</strong> the month.<br />

· a c/kWh Environmental Levy Charge, applied to the total active energy supplied <strong>in</strong> the month.<br />

· a R/day Service Charge based on the size of supply.<br />

· a R/day Adm<strong>in</strong>istration Charge based on the size of supply.<br />

For explanation of applicable charges - refer to pages 11 & 12<br />