Non-Local Authority & Local Authority Urban Tariffs<br />

cont<strong>in</strong>ued...<br />

TOU electricity tariff <strong>for</strong> urban p customers with an NMD greater than 1 MVA that are able to shift load, characterised by:<br />

· seasonally and time-of-use differentiated c/kWh Active Energy Charge; based on the supply voltage and the<br />

transmission zone.<br />

· three time-of-use periods namely Peak, Standard and Offpeak periods.<br />

· a R/kVA/month Transmission Network Charge based on the supply voltage, the transmission zone and the utilised<br />

capacity applicable dur<strong>in</strong>g all time periods.<br />

· a R/kVA/month Distribution Network Access Charge based on the supply voltage and the utilised capacity<br />

applicable dur<strong>in</strong>g all time periods.<br />

· a R/kVA/month Distribution Network Demand Charge based on the voltage supply and the chargeable demand<br />

applicable dur<strong>in</strong>g Peak and Standard periods.<br />

· a c/kvarh Reactive Energy Charge supplied <strong>in</strong> excess of 30 % (0,96 PF) of the kWh recorded dur<strong>in</strong>g the peak and<br />

standard periods. The excess reactive energy is determ<strong>in</strong>ed per 30-m<strong>in</strong>ute <strong>in</strong>tegrat<strong>in</strong>g period and accumulated <strong>for</strong> the<br />

month and will only be applicable dur<strong>in</strong>g the high-demand season.<br />

· a c/kWh Electrification and Rural Subsidy contribution to cross-subsidies to rural and Homelight tariffs, applied to the<br />

total active energy supplied <strong>in</strong> the month.<br />

· a c/kWh Environmental Levy Charge, applied to the total active energy supplied <strong>in</strong> the month.<br />

· a R/day Service Charge based on the size of supply.<br />

· a R/day Adm<strong>in</strong>istration Charge based on the size of supply.<br />

For explanation of applicable charges - refer to pages 11 & 12<br />

© Eskom July 2009 15