Part 1 Revenue Application: Multi-Year Price Determination ... - Eskom
Part 1 Revenue Application: Multi-Year Price Determination ... - Eskom
Part 1 Revenue Application: Multi-Year Price Determination ... - Eskom
Create successful ePaper yourself
Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.
Overview of <strong>Multi</strong>-<strong>Year</strong> <strong>Price</strong> <strong>Determination</strong><br />
2013/14–2017/18 (MYPD 3)<br />
The Department of Energy’s renewable energy IPP programme<br />
Page 62 of 144<br />
The DoE has embarked on a three-round programme to procure a total of 3 725MW in<br />
renewable energy from IPPs. To date the department has awarded round 1 and round 2<br />
allocations. The final round is still to be determined.<br />
All three rounds have been included in this MYPD 3 application pursuant to the<br />
determination made by the Minister of Energy.<br />
<strong>Eskom</strong>‟s role from this point on will be to sign power purchase agreements with the IPPs and<br />
connect them to the national grid. The contracts are subject to various assumptions,<br />
including load factors, availability and timing of grid connection. Should the awarded IPP<br />
generators not be completed on schedule or fail to achieve their desired load factors,<br />
<strong>Eskom</strong>‟s generators will be expected to compensate for the resulting shortfall in energy<br />
supply. <strong>Eskom</strong>‟s assumptions on IPPs over MYPD3 was based on guidance provided by<br />
government during interactions on the price application for MYPD3.<br />
Table 16: Capacity of Department of Energy’s renewable energy IPP programme (MW)<br />
MYPD 3<br />
Wind 1 500<br />
Concentrated solar power (CSP) 200<br />
Solar 1 900<br />
Hydro 75<br />
Other 50<br />
Total renewables capacity (MW) 3 725<br />
Table 17 depicts the costs and expected generating capacities of the DoE‟s peaking IPP,<br />
MTPPP, short term purchases and the renewable energy IPP programme. Table 18 gives a<br />
further breakdown of the figures for the DoE peaking station. These show the price impact<br />
and increase, capacity and load factors over the MYPD 3 period.