Overview of <strong>Multi</strong>-<strong>Year</strong> <strong>Price</strong> <strong>Determination</strong><br />

2013/14–2017/18 (MYPD 3)<br />

The Department of Energy’s renewable energy IPP programme<br />

Page 62 of 144<br />

The DoE has embarked on a three-round programme to procure a total of 3 725MW in<br />

renewable energy from IPPs. To date the department has awarded round 1 and round 2<br />

allocations. The final round is still to be determined.<br />

All three rounds have been included in this MYPD 3 application pursuant to the<br />

determination made by the Minister of Energy.<br />

<strong>Eskom</strong>‟s role from this point on will be to sign power purchase agreements with the IPPs and<br />

connect them to the national grid. The contracts are subject to various assumptions,<br />

including load factors, availability and timing of grid connection. Should the awarded IPP<br />

generators not be completed on schedule or fail to achieve their desired load factors,<br />

<strong>Eskom</strong>‟s generators will be expected to compensate for the resulting shortfall in energy<br />

supply. <strong>Eskom</strong>‟s assumptions on IPPs over MYPD3 was based on guidance provided by<br />

government during interactions on the price application for MYPD3.<br />

Table 16: Capacity of Department of Energy’s renewable energy IPP programme (MW)<br />

MYPD 3<br />

Wind 1 500<br />

Concentrated solar power (CSP) 200<br />

Solar 1 900<br />

Hydro 75<br />

Other 50<br />

Total renewables capacity (MW) 3 725<br />

Table 17 depicts the costs and expected generating capacities of the DoE‟s peaking IPP,<br />

MTPPP, short term purchases and the renewable energy IPP programme. Table 18 gives a<br />

further breakdown of the figures for the DoE peaking station. These show the price impact<br />

and increase, capacity and load factors over the MYPD 3 period.