Coal quality<br />

Overview of <strong>Multi</strong>-<strong>Year</strong> <strong>Price</strong> <strong>Determination</strong><br />

2013/14–2017/18 (MYPD 3)<br />

Page 56 of 144<br />

The quality of coal is vital for efficient power generation. Poor-quality coal has greater ash<br />

content, reduced calorific (energy) value and more rock impurities. This damages coal<br />

handling and grinding equipment, reduces the efficiency of power plants, causes load<br />

losses, and increases emissions and the ash-removal burden.<br />

Mining conditions and coal quality in Mpumalanga have deteriorated in recent years because<br />

high-quality coal has already been extracted, leaving behind only poorer-quality deposits.<br />

Moreover, coal is now being mined in difficult geological areas. In certain instances there is a<br />

need for better mine performance. This is being addressed on an ongoing basis.<br />

Coal beneficiation (purification), blending and online quality-monitoring capabilities were not<br />

built into most long-term coal supply agreements, making it a challenge to maintain<br />

consistent quality in the coal supplied to power stations. <strong>Eskom</strong> has undertaken various<br />

projects to improve the quality and consistency of its coal, including online coal-quality<br />

monitoring and beneficiation at cost-plus mines. <strong>Eskom</strong> is also engaging with mining houses<br />

to ensure the timely supply of life-of-mine plans to enable better quality control.<br />

<strong>Eskom</strong> obtains its coal from a number of local mines and has negotiated supply contracts<br />

with new long-term mines that will come on-stream during the MYPD 3 period. These mines<br />

are expected to meet <strong>Eskom</strong>‟s projected demand for coal of the required quality up to<br />

2017/18. This includes the coal for power stations that will be commissioned within the<br />

MYPD 3 period. Stock days have improved and currently hover between 40 and 45 days.<br />

Coal handling refers to all activities necessary to get coal to a boiler once it has been<br />

delivered to the power station. This includes stockpile maintenance and coal reclamation.<br />

The price of coal is influenced by the following factors:<br />

The recent boom in the coal-export market.<br />

The Mpumalanga coal basin is expected to reach peak production within the next<br />

five to 10 years and then decline sharply. When this happens, the difficulty (and<br />

cost) of mining coal is likely to increase sharply.<br />

Increased rates of coal burn have shortened the lifespan of mines.