24.08.2013 Views

Part 1 Revenue Application: Multi-Year Price Determination ... - Eskom

Part 1 Revenue Application: Multi-Year Price Determination ... - Eskom

Part 1 Revenue Application: Multi-Year Price Determination ... - Eskom

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

Overview of <strong>Multi</strong>-<strong>Year</strong> <strong>Price</strong> <strong>Determination</strong><br />

2013/14–2017/18 (MYPD 3)<br />

Table 54: Summary of proposed structural changes to tariffs<br />

Proposed change Driver<br />

Timing<br />

Tariff restructuring<br />

Update tariffs with new cost-to-serve study: ●<br />

● Apply differentiated price increase to different<br />

rate components - tariff restructuring<br />

● Explicit electrification and rural subsidies<br />

● The reliability service charge unbundled<br />

● Cost-reflectivity use-of-system charges<br />

Unbundle subsidies into a separate<br />

affordability (IBT) and network related subsidy<br />

● Nersa requirement for use-of-system<br />

charges<br />

- Could affect customers<br />

having to pay IBT subsidies<br />

Review of TOU Structure ● Cost reflectivity and pricing signal<br />

- Will affect customers<br />

depending on load profile<br />

April/July 2013<br />

Page 135 of 144<br />

Start April/July 2013<br />

Residential tariffs ● Greater flexibility, simplicity and<br />

compliance with the DoE EPP and the<br />

Electricity Regulation Act<br />

April/July 2013<br />

Low power factor charge<br />

- phase 1 introduction of reactive energy<br />

charge in all TOU time periods instead of<br />

only winter peak and off-peak periods<br />

Include the environmental levy in energy rates<br />

- but still provide information on the value<br />

Use-of-system charges<br />

- generators and loads<br />

- Use-of-system to be shown costreflective<br />

and low-voltage subsidy<br />

shown explicitly<br />

Reducing the low-voltage subsidies for urban<br />

tariffs<br />

Cost reflectivity and transparency<br />

- Will affect all customers<br />

● Pricing signal and improve system<br />

and network performance<br />

- Will negative impact customers<br />

with low power factor<br />

● Simplicity<br />

- Will affect low-voltage customers<br />

due to losses being charged<br />

cost reflectively<br />

● Transparency; flexibility and<br />

business and customer need<br />

- Should on its own have no<br />

impact on customers<br />

● Cost-reflectivity and equity<br />

- Reduces the cross subsidy paid<br />

by higher-voltage customers<br />

- Will negatively affect low-voltage<br />

customers<br />

April/July 2013<br />

April/July 2013<br />

April/July 2013<br />

April/July 2012

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!