<strong>Load</strong> <strong>set</strong> <strong>calculation</strong> DOWEC 6MW H. Efdé<br />
• tt+5-5, girders 0.5 o rotated, at root girder suction side 0.5m forward and girder pressure<br />
side 0.5 m aft.<br />
• tt-5+5, girders 0.5 o rotated, at root girder suction side 0.5m to aft and girder pressure side<br />
0.5 m forward.<br />
The modified turbine models are tested with load cases 008, 012, 018 and 024, 231 and 234. <strong>Load</strong><br />
case 231 is a stochastic windspeed of 12 m/s with –20 o yaw, 234 a stochastic windspeed of 25 m/s<br />
with –20 o yaw.<br />
To prevent interference of the blades with the turbine, the dynamic behaviour of the tower has been<br />
switched off. Also the baseline loadcases have been recalculated with tower dynamics off.<br />
This explains the difference in baseline loads in the table below, compared to the other<br />
variations.The results of the simulations are stored on CD C45.04/01.03/03 . The extreme and<br />
fatigue tables can be found in Appendix D as well.<br />
5.2.1 Cost of energy.<br />
The <strong>calculation</strong> of the cost of energy can only be based on the fatigue and extreme loads of the<br />
blades. Gearbox loads, tower loads and energy production are not taken into account because the<br />
aerodynamics of the blades are not changed and the tower dynamics are off. Therefore it is<br />
assumed that these parameters have not changed.<br />
Based on the changed loads the results in relative turbine costs are as follows:<br />
Table 13: Structural pitch, cost of energy.<br />
blade parameter baseline tt-5+5<br />
relative<br />
turbine<br />
costs tr+5-5<br />
relative<br />
turbine<br />
costs tt+5<br />
relative<br />
turbine<br />
costs tt+5-5<br />
relative<br />
turbine<br />
costs<br />
kNm % % % % % % % %<br />
Myb[1]-p[01] 15535.00 0.70 0.01 3.40 0.05 0.70 0.01 3.70 0.06<br />
1Hz-Mxb[1]-p[01] 8327.10 1.05 0.02 -0.60 -0.01 0.90 0.01 -12.00 -0.18<br />
total 0.03 total 0.04 total 0.02 total -0.12<br />
The influence of the design variations on the cost of energy is similar to the relative turbine costs.<br />
R45.04/01.03/03 Stentec, 3-1-03 page 16