22.08.2013 Views

INDC(IND)-35G - IAEA Nuclear Data Services

INDC(IND)-35G - IAEA Nuclear Data Services

INDC(IND)-35G - IAEA Nuclear Data Services

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

ENDF/B-IV<br />

- 28 -<br />

ATTEMPTS TO RUN<br />

LINEAR WITH 0-1%<br />

ACCURACY<br />

START FROM 0.1% RECENT OUTPUT<br />

FOR U-238 OBTAINED FROM<br />

CULLEN, <strong>IAEA</strong>.<br />

TOTAL NUMBER OF POINTS 302,941<br />

RUN SIGMA 1<br />

WITH 0-1%<br />

ACCURACY<br />

AT 300K<br />

ATTEMPTS<br />

UNSUCCUSSFUL<br />

BECAUSE OF<br />

VERY LARGE<br />

COMPUTER<br />

TIME<br />

RUN LINEAR<br />

WITH 1%<br />

ERROR<br />

CRITERION<br />

ATTEMPTS TO RUN<br />

RECENT WITH 0-1%<br />

ACCURACY<br />

ATTEMPTS WERE NOT SUCCESSFUL<br />

AS IT TAKFS MORE THAN 40<br />

HOURS OF CPU- THE CPU TIME<br />

IS 60 MINUTES WITH 10% ACCURACY<br />

CRITERION FOR RECENT AND 1%<br />

FOR LINEAR STAGE. THIS<br />

LARGE ACCURACY CRITERION<br />

IS NOT ACCEPTABLE<br />

RESULT: THINNED<br />

OUTPUT: 95 792 POINTS<br />

TIME TAKEN BY LINEAR: 0-2419 HOURS<br />

RUN SIGMA 1 AT 300K<br />

ERROR CRITERION 0-2%POINTS; 27776<br />

COMPUTER TIME FOR SIGMA 1: '9870 HOURS<br />

EXPECTED COMBIN ED ERROR IN PREPROCESSING<br />

1-03% RECENT (0-1%) LINEAR (1%) SIGMA 1(0-2%)<br />

Fig.l Flow Chart describing the Preprocessing Experience for the<br />

Nuclide U-238 '

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!