ORDER NO. NGP/WCL/MMW(HQ)/P-II/CRS -130/UPS/L-32/10-11/40032189<br />
Date : 18.12.<strong>20</strong>10<br />
First day : from 12.00 hours to 05.30 hours ( i.e. 5:30 hours)<br />
Second day : from 09.30 hours to 11.00 hours ( i.e. 1:30 hours<br />
Total downtime : 7 hours<br />
15. The availability percentage will be calculated <strong>for</strong> each calendar month. Penalty will be<br />
imposed on pro rate basis, if the availability falls below 95%. Thus<br />
{ (95% - actual availability %) x Monthly AMC Charges }<br />
Penalty = ----------------------------------------------------------<br />
95<br />
16. No bonus or additional sums shall be payable if the availability is more than 95%.<br />
Actual availability percentage <strong>for</strong> the UPS will be calculated as follows :-<br />
{(No. of working days in the month X 8) – (Downtime hours during month)}<br />
Actual<br />
Availability = ----------------------------------------------------------------X 100<br />
No. of working days in the month X 8<br />
17. Uptime will be <strong>for</strong> the entire UPS system, i.e. in case, part of the UPS is out of <strong>order</strong> the<br />
total UPS system will be considered to be under breakdown.<br />
18. If the reaons, other than faulty power supply the availability falls below 95% of the UPS<br />
and continously <strong>for</strong> a period of more than one month, the penalty will be double the rate<br />
calculated above ( under 14 and 15 ) (pro rata basis). Under no condition availability<br />
should fall below 75%, then no AMC charges shall be paid <strong>for</strong> the month,