Disassembly/Assembly Procedures LTC Repair See Graphic: wc_gr003533 Reassembly: 7.10.9 Grease the adjusting point circle (a) of the main cradle and the bottom pivot point (b) of the main mast. 7.10.10 Using an appropriate crane or hoist, lift the main mast onto the top of the generator enclosure. Slide the bottom of the main mast into the main cradle. 7.10.11 Secure the main mast to the main cradle with the washer and nut (c). 7.10.12 Position the cable clip (d), on the tower supply cable, just below the lower curled portion of the cable. Then, secure the cable clip to the end of the main mast. 7.10.13 Thread the tower supply cable through the eyes (e) on the main mast. 7.10.14 Thread the tower supply cable through the clamp (f) at the front of the machine; leave a loop (g) of cable large enough so there is enough slack in the cable to raise the mast. 7.10.15 Feed the tower supply cable into the control box and connect the wires to the appropriate locations (h & i). Refer to the wiring diagram. Tighten the cable clamp (j), organize the wires with new wire ties (k), and re-install the control panel cover. 134

LTC Repair Disassembly/Assembly Procedures a f e g c b 135 j k d h i wc_gr003533

Disassembly/Assembly Procedures <strong>LTC</strong> <strong>Repair</strong><br />

See Graphic: wc_gr003533<br />

Reassembly:<br />

7.10.9 Grease the adjusting point circle (a) of the main cradle and the bottom<br />

pivot point (b) of the main mast.<br />

7.10.10 Using an appropriate crane or hoist, lift the main mast onto the top of<br />

the generator enclosure. Slide the bottom of the main mast into the<br />

main cradle.<br />

7.10.11 Secure the main mast to the main cradle with the washer and nut (c).<br />

7.10.12 Position the cable clip (d), on the tower supply cable, just below the<br />

lower curled portion of the cable. Then, secure the cable clip to the end<br />

of the main mast.<br />

7.10.13 Thread the tower supply cable through the eyes (e) on the main mast.<br />

7.10.14 Thread the tower supply cable through the clamp (f) at the front of the<br />

machine; leave a loop (g) of cable large enough so there is enough<br />

slack in the cable to raise the mast.<br />

7.10.15 Feed the tower supply cable into the control box and connect the wires<br />

to the appropriate locations (h & i). Refer to the wiring diagram.<br />

Tighten the cable clamp (j), organize the wires with new wire ties (k),<br />

and re-install the control panel cover.<br />