21.08.2013 Views

LTC Repair Lombardini Engine Troubleshooting - Wacker Neuson

LTC Repair Lombardini Engine Troubleshooting - Wacker Neuson

LTC Repair Lombardini Engine Troubleshooting - Wacker Neuson

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

<strong>LTC</strong> <strong>Repair</strong> Disassembly/Assembly Procedures<br />

WARNING<br />

Reassembly:<br />

Replacement cables must be of the exact length of the original<br />

equipment. Using shorter cables may cause severe personal injury.<br />

7.9.14 Attach the cable to the mid mast.<br />

7.9.15 Hold the cable snug to upper side of the mid mast and insert it into the<br />

main mast (a) 3/4 of the way, approximately 7 feet (2.3 m).<br />

7.9.16 Attach the five guides (g) using the new self-tapping screws. Position<br />

the guides so that the self-tapping screws thread themselves into the<br />

smaller side of the tapered hole in the guide.<br />

Note: Limit reuse of the guides to one time.<br />

The guides must be installed because they serve as safety stops.<br />

Without them properly installed, the mid-mast section could be pulled<br />

out of the main-mast section, possibly causing severe bodily harm.<br />

7.9.17 Route cable (yy) around the main-mast pulley (zz) and install the mainmast<br />

pulley.<br />

7.9.18 Slide the mid mast completely into the main mast.<br />

7.9.19 Attach the cable to the winch.<br />

7.9.20 See section Upper Mast for installing the upper mast.<br />

WARNING<br />

cc<br />

zz<br />

ww<br />

yy<br />

131<br />

xx<br />

wc_gr003795

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!