Implementation of the PIMS Project in CEMEX ... - OSIsoft
Implementation of the PIMS Project in CEMEX ... - OSIsoft
Implementation of the PIMS Project in CEMEX ... - OSIsoft
Create successful ePaper yourself
Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.
The <strong>Implementation</strong> Plan covers two years, and <strong>in</strong>cludes all <strong>the</strong> Cement<br />
and Gr<strong>in</strong>d<strong>in</strong>g Plants; <strong>the</strong> 2007 scope reaches 14 Countries, 34 Cement<br />
Plants and 4 Gr<strong>in</strong>d<strong>in</strong>g Plants …<br />
The <strong>PIMS</strong> System was approved to be <strong>in</strong>stalled <strong>in</strong> a 2 years program,<br />
cover<strong>in</strong>g 82 Cement and Gr<strong>in</strong>d<strong>in</strong>g facilities<br />
The 2007 <strong>Implementation</strong> Plan was def<strong>in</strong>ed toge<strong>the</strong>r with <strong>the</strong> Regional<br />
Technical and Operation VPs:<br />
Copyright © 2007 OSIs<strong>of</strong>t, Inc. All rights reserved.<br />
Reaches 14 Countries.<br />
Covers 34 Cement Plants and 4 Gr<strong>in</strong>d<strong>in</strong>g Plants: 29 new Systems<br />
and <strong>the</strong> upgrade <strong>of</strong> 9 Systems…<br />
23