CUTMASTER 25mm<br />

D. IGBT Modules Test<br />

1. Disconnect transformer wires from Main PCB<br />

terminals PRI 1 (A) and PRI 4 (D).<br />

2. Using an ohmmeter perform the following<br />

checks<br />

IGBT A<br />

Meter (+) Meter (-) Indication<br />

PRI 1 (A) MTH 2 Forward Bias<br />

PRI 1 (A) MTH 4 Reverse Bias<br />

MTH 2 PRI 1 (A) Reverse Bias<br />

MTH 4 PRI 1 (A) Forward Bias<br />

PRI 2 (B) MTH 2 Forward Bias<br />

PRI 2 (B) MTH 4 Reverse Bias<br />

MTH 2 PRI 2 (B) Reverse Bias<br />

MTH 4 PRI 2 (B) Forward Bias<br />

IGBT B<br />

Meter (+) Meter (-) Indication<br />

PRI 3 (C) MTH 6 Forward Bias<br />

PRI 3 (C) MTH 5 Reverse Bias<br />

MTH 6 PRI 3 (C) Reverse Bias<br />

MTH 5 PRI 3 (C) Forward Bias<br />

PRI 4 (D) MTH 6 Forward Bias<br />

PRI 4 (D) MTH 5 Reverse Bias<br />

MTH 6 PRI 4 (D) Reverse Bias<br />

MTH 5 PRI 4 (D) Forward Bias<br />

3. If the test reveals a failed component, replace<br />

Main Pcb and perform main contactor test – Section<br />

5.12A. If no problem is found, reconnect the<br />

transformer wires to Main PCB.<br />

E. Output Diode Module Test<br />

1. Disconnect transformer wires from Main PCB<br />

terminal SEC 1.<br />

2. Using an ohmmeter perform the tests in the<br />

chart<br />

Output Diode Module<br />

Meter (+) Meter (-) Indication<br />

SEC 1 WORK 1 Forward Bias<br />

SEC 1 CHOKE 1 Reverse Bias<br />

WORK 1 SEC 1 Reverse Bias<br />

CHOKE 1 SEC 1 Forward Bias<br />

SEC 2 WORK 1 Forward Bias<br />

SEC2 CHOKE 1 Reverse Bias<br />

WORK 1 SEC2 Reverse Bias<br />

CHOKE 1 SEC 2 Forward Bias<br />

3. If the test reveals a failed component, replace<br />

Main Pcb. If no problem is found, reconnect the<br />

transformer wires to Main PCB.<br />

F. Pilot IGBT Test<br />

1. Disconnect wire from Main PCB terminal TIP1<br />

2. Measure continuity on Main PCB between test<br />

point GND1 to terminal TIP1<br />

3. If the test reveals a failed component, replace<br />

Main PCB. If no problem is found, reconnect wire<br />

to Main PCB.<br />

SERVICE 5-20 <strong>Manual</strong> 0-5081