20.08.2013 Views

Rewari Kanpur Pipeline Project Bid Document for Supply o

Rewari Kanpur Pipeline Project Bid Document for Supply o

Rewari Kanpur Pipeline Project Bid Document for Supply o

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

INDEX<br />

ARTICLE<br />

SR. NO.<br />

DESCRIPTION<br />

1. 0 COST OF BIDDING<br />

2.0 BID DOCUMENT<br />

3.0 LANGUAGE OF BID<br />

4.0 BID DUE DATE & TIME<br />

5.0 PERIOD OF VALIDITY OF BIDS<br />

6. 0 MODIFICATION & WITHDRAWAL OF BIDS<br />

7.0 BID PARTS / SEALING & MARKING OF BID<br />

8.0 DOCUMENTS COMPRISING OF THE BIDS<br />

9.0 BID<br />

10. 0 OPENING OF BIDS<br />

11.0 EVALUATION OF BIDS<br />

12. 0 REJECTION CRITERIA<br />

13. 0 VOID<br />

14. 0 COMPARISON OF BID<br />

15. 0 CONTACTING THE OWNER/CONSULTANT<br />

16. 0 AWARD CRITERIA<br />

17. 0 OWNER’S/CONSULTANT’S RIGHT TO ACCEPT ANY BID AND TO<br />

REJECT ANY OR ALL BIDS<br />

18. 0 NOTIFICATION OF AWARD<br />

19.0 ISSUE OF ORDER<br />

20.0 LATE BIDS<br />

21.0 INTEGRITY PACT<br />

22.0 REBATE<br />

23.0 APPOINTMENT OF WORLEYPARSONS BY OWNER (HPCL)<br />

24.0 DEVIATIONS TO TENDER TERMS<br />

25.0 FOREIGN BIDDER CONDITION<br />

MH2145-C000-PP-RFQ-0026 Page 22 of 131

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!