Ergoline Excellence, Evolution, Advantage, Affinity Series, Open Sun 550 / Soltron XL, M, L, S Series<br />

In addition to the prescribed maintenance schedule in the owner’s manual, the following items should be checked to ensure safe operation and use of your tanning<br />

system.<br />

Component Interval Activity<br />

250 h / 3 Months*<br />

500 h / 6 Months*<br />

1 Springs X Inspect and replace as<br />

necessary<br />

Springs X Replace<br />

2 Bolts and fasteners of the<br />

canopy hinge mechanism.<br />

Bolts and fasteners of the<br />

canopy lift mechanism.<br />

Bolts and fasteners of the<br />

canopy hinge/Lift mechanism.<br />

3 Bolts and fasteners of the<br />

base/tank hinge/lift<br />

mechanism<br />

Bolts and fasteners of the<br />

base/tank hinge/lift<br />

mechanism<br />

2500 h / 1 Year*<br />

5000 h / 5 Years*<br />

10000 h / 10 Years*<br />

X Inspect and replace as<br />

necessary<br />

X Inspect and replace as<br />

necessary<br />

X Replace<br />

X Inspect and replace as<br />

necessary<br />

X Replace<br />

4 cylinders X Inspect and replace as<br />

necessary<br />

cylinders X Replace<br />

5 Chasis and associated<br />

fasteners<br />

Chasis and associated<br />

fasteners<br />

6 Wiring and associated Plugs /<br />

Terminal Connections<br />

X Inspect and replace as<br />

necessary<br />

X Replace<br />

X Inspect and replace as<br />

necessary<br />

7 Acrylic Panels† X Inspect and replace as<br />

necessary<br />

Acrylic Panels† X Replace<br />

8 Acrylic Support(s) X Inspect and replace as<br />

necessary<br />

Acrylic Support(s) X Replace<br />

9 High Pressure filter glass X Inspect and replace as<br />

necessary<br />

High Pressure filter glass X Replace<br />

* Interval must be repeated after each inspection or replacement (i.e. 1st: 3 months, 2nd: 6 months, 3rd: 9 months, etc.)<br />

† The schedule for acrylic replacement listed refers only to the condition of the acrylic relating to safety and does not address the efficacy of UV<br />

transmission.<br />

October 21, 2010


Ergoline Open Sun 1050 / Soltron XXL-105 Kiwi King<br />

In addition to the prescribed maintenance schedule in the owner’s manual, the following items should be checked to ensure safe operation and use of your tanning<br />

system.<br />

Component Interval Activity<br />

1 Bolts and fasteners of the<br />

canopy hinge mechanism.<br />

Bolts and fasteners of the<br />

canopy lift mechanism.<br />

Bolts and fasteners of the<br />

canopy hinge/Lift<br />

mechanism.<br />

2 Bolts and fasteners of the<br />

base/tank hinge/lift<br />

mechanism<br />

Bolts and fasteners of the<br />

base/tank hinge/lift<br />

mechanism<br />

3 Chasis and associated<br />

fasteners<br />

Chasis and associated<br />

fasteners<br />

4 Wiring and associated Plugs<br />

/ Terminal Connections<br />

250 h / 3 Months*<br />

500 h / 6 Months*<br />

2500 h / 1 Year*<br />

5000 h / 5 Years*<br />

10000 h / 10 Years*<br />

X Inspect and replace as<br />

necessary<br />

X Inspect and replace as<br />

necessary<br />

X Replace<br />

X Inspect and replace as<br />

necessary<br />

X Replace<br />

X Inspect and replace as<br />

necessary<br />

X Replace<br />

X Inspect and replace as<br />

necessary<br />

5 Acrylic Panels† X Inspect and replace as<br />

necessary<br />

Acrylic Panels† X Replace<br />

6 Acrylic Support(s) X Inspect and replace as<br />

necessary<br />

Acrylic Support(s) X Replace<br />

7 High Pressure filter glass X Inspect and replace as<br />

necessary<br />

High Pressure filter glass X Replace<br />

* Interval must be repeated after each inspection or replacement (i.e. 1st: 3 months, 2nd: 6 months, 3rd: 9 months, etc.)<br />

† The schedule for acrylic replacement listed refers only to the condition of the acrylic relating to safety and does not address the efficacy of UV<br />

transmission.<br />

October 21, 2010


Ergoline Prestiege, Esprit, Inspiration Series / Soltron S Series<br />

In addition to the prescribed maintenance schedule in the owner’s manual, the following items should be checked to ensure safe operation and use of your tanning<br />

system.<br />

Component Interval Activity<br />

250 h / 3 Months*<br />

500 h / 6 Months*<br />

1 Springs X Inspect and replace as<br />

necessary<br />

Springs X Replace<br />

2 Bolts and fasteners of the<br />

canopy hinge mechanism.<br />

Bolts and fasteners of the<br />

canopy lift mechanism.<br />

Bolts and fasteners of the<br />

canopy hinge/Lift mechanism.<br />

3 Bolts and fasteners of the<br />

base/tank hinge/lift<br />

mechanism<br />

Bolts and fasteners of the<br />

base/tank hinge/lift<br />

mechanism<br />

2500 h / 1 Year*<br />

5000 h / 5 Years*<br />

10000 h / 10 Years*<br />

X Inspect and replace as<br />

necessary<br />

X Replace<br />

X Inspect and replace as<br />

necessary<br />

X Inspect and replace as<br />

necessary<br />

Replace<br />

4 cylinders X Inspect and replace as<br />

necessary<br />

cylinders X Replace<br />

5 Chasis and associated<br />

fasteners<br />

Chasis and associated<br />

fasteners<br />

6 Wiring and associated Plugs /<br />

Terminal Connections<br />

X Inspect and replace as<br />

necessary<br />

X Replace<br />

X Inspect and replace as<br />

necessary<br />

7 Acrylic Panels† X Inspect and replace as<br />

necessary<br />

Acrylic Panels† X Replace<br />

8 Acrylic Support(s) X Inspect and replace as<br />

necessary<br />

Acrylic Support(s) X Replace<br />

9 High Pressure filter glass X Inspect and replace as<br />

necessary<br />

High Pressure filter glass X Replace<br />

* Interval must be repeated after each inspection or replacement (i.e. 1st: 3 months, 2nd: 6 months, 3rd: 9 months, etc.)<br />

† The schedule for acrylic replacement listed refers only to the condition of the acrylic relating to safety and does not address the efficacy of UV<br />

transmission.<br />

October 21, 2010


Ergoline Ambition and Passion Series / Soltron XS and XXS<br />

In addition to the prescribed maintenance schedule in the owner’s manual, the following items should be checked to ensure safe operation and use of your tanning<br />

system.<br />

Component Interval Activity<br />

250 h / 3 Months*<br />

500 h / 6 Months*<br />

1 Springs X Inspect and replace as<br />

necessary<br />

Springs X Replace<br />

2 Bolts and fasteners of the<br />

canopy hinge mechanism.<br />

Bolts and fasteners of the<br />

canopy lift mechanism.<br />

Bolts and fasteners of the<br />

canopy hinge/Lift<br />

mechanism.<br />

3 Bolts and fasteners of the<br />

base/tank hinge/lift<br />

mechanism<br />

Bolts and fasteners of the<br />

base/tank hinge/lift<br />

mechanism<br />

2500 h / 1 Year*<br />

5000 h / 5 Years*<br />

10000 h / 10 Years*<br />

X Inspect and replace as<br />

necessary<br />

X Inspect and replace as<br />

necessary<br />

X Replace<br />

X Inspect and replace as<br />

necessary<br />

X Replace<br />

4 cylinders X Inspect and replace as<br />

necessary<br />

cylinders X Replace<br />

5 Chasis and associated<br />

fasteners<br />

Chasis and associated<br />

fasteners<br />

6 Wiring and associated Plugs<br />

/ Terminal Connections<br />

X Inspect and replace as<br />

necessary<br />

X Replace<br />

X Inspect and replace as<br />

necessary<br />

7 Acrylic Panels† X Inspect and replace as<br />

necessary<br />

Acrylic Panels† X Replace<br />

8 Acrylic Support(s) X Inspect and replace as<br />

necessary<br />

Acrylic Support(s) X Replace<br />

9 High Pressure filter glass X Inspect and replace as<br />

necessary<br />

High Pressure filter glass X Replace<br />

* Interval must be repeated after each inspection or replacement (i.e. 1st: 3 months, 2nd: 6 months, 3rd: 9 months, etc.)<br />

† The schedule for acrylic replacement listed refers only to the condition of the acrylic relating to safety and does not address the efficacy of UV<br />

transmission.<br />

October 21, 2010


SunDash R Series, Competition Series, Performance Series, Pro Series / Soltron Seashell Series<br />

In addition to the prescribed maintenance schedule in the owner’s manual, the following items should be checked to ensure safe operation and use of your tanning<br />

system.<br />

Component Interval Activity<br />

250 h / 3 Months*<br />

500 h / 6 Months*<br />

1 Springs X Inspect and replace as<br />

necessary<br />

Springs X Replace<br />

2 Bolts and fasteners of the<br />

canopy hinge mechanism.<br />

Bolts and fasteners of the<br />

canopy lift mechanism.<br />

Bolts and fasteners of the<br />

canopy hinge/Lift<br />

mechanism.<br />

2500 h / 1 Year*<br />

5000 h / 5 Years*<br />

10000 h / 10 Years*<br />

X Inspect and replace as<br />

necessary<br />

X Inspect and replace as<br />

necessary<br />

X Replace<br />

3 cylinders X Inspect and replace as<br />

necessary<br />

cylinders X Replace<br />

4 Chasis and associated<br />

fasteners<br />

Chasis and associated<br />

fasteners<br />

X Inspect and replace as<br />

necessary<br />

X Replace<br />

5 Acrylic Panels† X Inspect and replace as<br />

necessary<br />

Acrylic Panels† X Replace<br />

5 Acrylic Support(s) X Inspect and replace as<br />

necessary<br />

Acrylic Support(s) X Replace<br />

6 Wiring and associated Plugs<br />

/ Terminal Connections<br />

X Inspect and replace as<br />

necessary<br />

7 High Pressure filter glass X Inspect and replace as<br />

necessary<br />

High Pressure filter glass X Replace<br />

* Interval must be repeated after each inspection or replacement (i.e. 1st: 3 months, 2nd: 6 months, 3rd: 9 months, etc.)<br />

† The schedule for acrylic replacement listed refers only to the condition of the acrylic relating to safety and does not address the efficacy of UV<br />

transmission.<br />

October 21, 2010


Ergoline Classic Series<br />

In addition to the prescribed maintenance schedule in the owner’s manual, the following items should be checked to ensure safe operation and use of your tanning<br />

system.<br />

Component Interval Activity<br />

250 h / 3 Months*<br />

500 h / 6 Months*<br />

1 Springs X Inspect and replace as<br />

necessary<br />

Springs X Replace<br />

2 Bolts and fasteners of the<br />

canopy hinge mechanism.<br />

Bolts and fasteners of the<br />

canopy lift mechanism.<br />

Bolts and fasteners of the<br />

canopy hinge/Lift mechanism.<br />

3 Bolts and fasteners of the<br />

base/tank hinge/lift<br />

mechanism<br />

Bolts and fasteners of the<br />

base/tank hinge/lift<br />

mechanism<br />

2500 h / 1 Year*<br />

5000 h / 5 Years*<br />

10000 h / 10 Years*<br />

X Inspect and replace as<br />

necessary<br />

X Inspect and replace as<br />

necessary<br />

X Replace<br />

X Inspect and replace as<br />

necessary<br />

X Replace<br />

4 cylinders X Inspect and replace as<br />

necessary<br />

cylinders X Replace<br />

5 Chasis and associated<br />

fasteners<br />

Chasis and associated<br />

fasteners<br />

6 Wiring and associated Plugs /<br />

Terminal Connections<br />

X Inspect and replace as<br />

necessary<br />

X Replace<br />

X Inspect and replace as<br />

necessary<br />

7 Acrylic Panels† X Inspect and replace as<br />

necessary<br />

Acrylic Panels† X Replace<br />

8 Acrylic Support(s) X Inspect and replace as<br />

necessary<br />

Acrylic Support(s) X Replace<br />

97 High Pressure filter glass X Inspect and replace as<br />

necessary<br />

High Pressure filter glass X Replace<br />

* Interval must be repeated after each inspection or replacement (i.e. 1st: 3 months, 2nd: 6 months, 3rd: 9 months, etc.)<br />

† The schedule for acrylic replacement listed refers only to the condition of the acrylic relating to safety and does not address the efficacy of UV<br />

transmission.<br />

Ergoline Shuttle, Vertical, Sunrise / Soltron V Series / SunDash Radius Series<br />

October 21, 2010


In addition to the prescribed maintenance schedule in the owner’s manual, the following items should be checked to ensure safe operation and use of your tanning<br />

system.<br />

Component Interval Activity<br />

1 Bolts, fasteners, bushings of<br />

the door hinge mechanism.<br />

Bolts, fasteners, bushings of<br />

the door hinge mechanism.<br />

2 Bolts and fasteners of the<br />

dressing room and doors (if<br />

applicable)<br />

Bolts and fasteners of the<br />

dressing room and doors (if<br />

applicable)<br />

250 h / 3 Months*<br />

500 h / 6 Months*<br />

2500 h / 1 Year*<br />

5000 h / 5 Years*<br />

10000 h / 10 Years*<br />

X Inspect and replace as<br />

necessary<br />

X Replace<br />

X Inspect and replace as<br />

necessary<br />

X Replace<br />

3 Door Wiring X Inspect and replace as<br />

necessary ‡<br />

Door Wiring X Replace‡<br />

4 Chasis and associated<br />

fasteners<br />

Chasis and associated<br />

fasteners<br />

5 Wiring and associated Plugs /<br />

Terminal Connections<br />

X Inspect and replace as<br />

necessary<br />

X Replace<br />

X Inspect and replace as<br />

necessary<br />

6 Acrylic Panels† X Inspect and replace as<br />

necessary<br />

Acrylic Panels† X Replace<br />

* Interval must be repeated after each inspection or replacement (i.e. 1st: 3 months, 2nd: 6 months, 3rd: 9 months, etc.)<br />

† The schedule for acrylic replacement listed refers only to the condition of the acrylic relating to safety and does not address the efficacy of UV<br />

transmission.<br />

‡ Inspection may not be sufficient for some units of model Sundash Radius 252 and must have cord replaced. Contact JK Global Service for<br />

information regarding this component.<br />

October 21, 2010

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!