19.08.2013 Views

DC motor - Siemens, s.r.o.

DC motor - Siemens, s.r.o.

DC motor - Siemens, s.r.o.

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

Checklists, notes<br />

9.2 Checklist for commissioning<br />

Checklist for commissioning<br />

Table 9-2 Checklist for commissioning<br />

Points to be checked<br />

Correct installation of the system<br />

Installation in accordance with stipulations<br />

Control functions and speed monitoring in accordance with stipulations<br />

o.k. Comments<br />

Light-load operation ( I < 0.5 IN, measures carried out?) Yes<br />

No<br />

Proper installation and alignment of the <strong>motor</strong><br />

Drive elements in accordance with stipulations (axial position,<br />

alignment and balancing of couplings, etc.)<br />

Compliance with minimum insulation resistances<br />

Motor connected up corresponding to the specified direction of<br />

rotation.<br />

Grounding and equipotential bonding connections correctly made.<br />

Rotor can be spun without coming into contact with the stator<br />

Flow of cooling air not impeded.<br />

Carbon brushes and brush arms freely moveable<br />

Uniform spring pressure of all brush holders<br />

All mounting screws, connecting elements and electrical connections<br />

are tight.<br />

Bearings relubricated<br />

Bearing insulation not bridged<br />

Supplementary devices and equipment (temperature monitoring, anticondensation<br />

heating, etc.) connected and functioning<br />

All shock-protection and guard measures for moving or live parts have<br />

been taken<br />

If the second shaft end has not been used, its featherkey has been<br />

secured to prevent it being thrown out<br />

Any separately driven fans are ready for operation and have been<br />

connected such that they rotate in the direction specified<br />

Any brakes fitted have been checked for proper functioning<br />

If air-to-water closed-circuit cooling is fitted: is the water cooler<br />

connected, filled, vented and ready for operation<br />

In the case of a long period between installation and start-up: test run<br />

without water cooling carried out.<br />

Comments:<br />

Date Name Signature<br />

[ID 556]<br />

SIEMENS AG T61160347010001 (DMHO V9)<br />

9-2 Operating instructions 1GG6286-0NA4.-1VV1-Z

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!