19.08.2013 Views

DC motor - Siemens, s.r.o.

DC motor - Siemens, s.r.o.

DC motor - Siemens, s.r.o.

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

Checklists, notes<br />

9.1 Checklist for energizing<br />

Checklist for energizing<br />

Table 9-1 Checklist for energizing<br />

Points to be checked<br />

Start the <strong>motor</strong> briefly without any load coupled "Start <strong>motor</strong>" - direction<br />

of rotation checked<br />

o.k. Comments<br />

As the <strong>motor</strong> runs down, mechanical running checked for noises or<br />

vibrations in the bearings and bearing end shields<br />

Start the <strong>motor</strong> again and run up to maximum permissible speed –<br />

smooth running checked<br />

If the <strong>motor</strong> is running perfectly, switch on the available cooling<br />

system.<br />

Motor observed for a period of time at no load<br />

When the <strong>motor</strong> is running perfectly, apply load – smooth running<br />

checked<br />

Values for voltage, current and output recorded. If possible,<br />

corresponding values for the driven machine recorded<br />

If possible, temperature of the bearings, windings etc. monitored and<br />

recorded until steady-state point reached<br />

Energizing time shortened accordingly if air-to-water heat exchanger is<br />

not yet operated in an "advance" test run<br />

Comments:<br />

Date Name Signature<br />

[ID 557]<br />

SIEMENS AG T61160347010001 (DMHO V9)<br />

Operating instructions 1GG6286-0NA4.-1VV1-Z 9-1

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!