Introduction<br />
would require an initial capital allocation of $3 million. This<br />
cost was based on the use of water or steam injection, flue gas<br />
recirculation, and boiler tuning.<br />
Due to the significant cost of reducing NO x emissions at<br />
Newman Station, and taking into consideration that the three<br />
grandfathered units are scheduled <strong>for</strong> retirement within the next<br />
15 years, EPE determined that it was more cost-effective to<br />
obtain additional allowances rather than install on-site abatement<br />
technology. A Texas law (30 TAC § 101.337) allows EGFs<br />
in El Paso to meet emissions allowances by using credits generated<br />
in Ciudad Juárez. 2<br />
Located in Ciudad Juárez are approximately 350 primitive<br />
kilns used to manufacture bricks (Figure 2). These kilns are<br />
open-top structures in which so-called green bricks are stacked.<br />
A fire is maintained at the base of the kiln by burning wood,<br />
sawdust, tires, refuse, or other fuel. The kilns emit large clouds<br />
of soot, carbon monoxide (CO), NO x , and volatile organic compounds<br />
(VOCs) (Figure 3).<br />
Source: El Paso Electric Company<br />
Figure 2. A Brick Kiln<br />
17