5.2 Tests During Construction<br />

95<br />

<strong>Quality</strong> <strong>Assurance</strong> <strong>Handbook</strong> <strong>for</strong> <strong>Rural</strong> <strong>Roads</strong><br />

The quality control tests to be carried out during construction are indicated in Table 505.3.<br />

Table 505.3 : QUALITY CONTROL TESTS DURING CONSTRUCTION<br />

Type of Test Frequency<br />

1. Rate of spread of binder At least one test daily<br />

2. Rate of Spread of aggregates -do-<br />

3. Aggregate Grading (IS:2386 Part 1) -do-<br />

4. Temperature of binder during spraying Regularly, at close intervals<br />

5. Thickness of compacted layer At random<br />

5.3 <strong>Quality</strong> Control Checks by AE/EE<br />

The quality checks to be exercised by AE/EE are indicated in Table 505.4.<br />

TABLE 505.4 : QUALITY CONTROL CHECKS BY AE/EE<br />

Stage Test Frequency Designation of<br />

Inspecting Officer<br />

Completed layer of Built-up Surface Regularity and Random Checking EE<br />

Spray Grout/Modified<br />

Penetration Macadam<br />

Transverse profile<br />

C. Do’s and Don’ts<br />

Do’s Don’ts<br />

1. Ensure that aggregates con<strong>for</strong>m to grading specified<br />

and are dry and clean at the time of laying.<br />

2. Maintain the temperature of bitumen appropriate to<br />

the grade of bitumen.<br />

3. Remove excessive deposits of binder during spray<br />

operation.<br />

506. MODIFIED PENETRATION MACADAM<br />

A. Methodology<br />

1. Do not undertake the work in foggy. rainy or windy<br />

weather or when the atmospheric temperature in the<br />

shade is less than l00C. 2. Do not allow any traffic over Built up spray grout<br />

without laying wearing course or seal coat.<br />

1. Prepare the base on which modified penetration macadam course is to be laid to the specified<br />

lines, grade and cross-section.<br />

2. Apply a tack coat, over the base preparatory to laying of the modified penetration macadam.<br />

3. Ensure that the coarse aggregates comply with the physical requirements laid down in Table<br />

504.2. The coarse and key aggregates shall be 40 mm size hand broken metal and 12 mm size stone<br />

chips respectively. Upto 30% of total quantity of 40 mm metal may be crusher broken. The quantities<br />

of material shall be as per Tables 506.1 and 506.2.