3. Section-500<br />

(b) Bitumen<br />

The binder should be paving bitumen of penetration grade complying with IS:73 or an<br />

appropriate grade of emulsion complying with IS:8887, where permitted or specified in the<br />

contract.<br />

2. Horizontal Alignment<br />

The edges of the Built-up Spray Grout layer should be correct within a tolerance limit of (±) 30<br />

mm in plain and rolling terrain and (±) 50 mm in hilly terrain.<br />

3. Surface Level<br />

The tolerance in surface level of the Built-up spray grout should be (±) 6 mm.<br />

4. Surface Regularity<br />

The maximum allowable difference between the road surface and a 3 m straight edge should be<br />

12 mm <strong>for</strong> longitudinal profile and 8 mm <strong>for</strong> cross profile.<br />

5. <strong>Quality</strong> Control Tests<br />

5.1 Tests Prior to Construction<br />

The quality control tests to be carried out prior to construction are indicated in Table 505.2.<br />

TABLE 505.2 : QUALITY CONTROL TESTS PRIOR TO CONSTRUCTION<br />

Type of Test Frequency<br />

1. <strong>Quality</strong> of Binder (Straight-run Bitumen) (IS:73)<br />

(a) Penetration Test One test per lot<br />

(b) R&B Softening Point Test -do-<br />

(c) Ductility Test -do-<br />

2. <strong>Quality</strong> of Binder (Modified Bitumen) (IS:15462)<br />

(a) Penetration Test -do-<br />

(b) R&B Softening Point Test -do-<br />

(c) Elastic Recovery Test(d) Separation Test -do-<br />

3. Aggregate Impact Value Test (IS:2386 Part 4) One test on representative sample per km length<br />

from each source identified by the Contractor<br />

4. Flakiness Index Test (IS:2386 Part 1) -do-<br />

5. Bitumen Stripping of Aggregate Test (IS:6241) -do-<br />

6. Water Absorption (IS:2386 Part 3) -do-<br />

7. Soundness Test, if water absorption of aggregate -doexceeds<br />

2% (IS:2386 Part 5)<br />