18.08.2013 Views

Quality Assurance Handbook for Rural Roads Volume-I - pmgsy

Quality Assurance Handbook for Rural Roads Volume-I - pmgsy

Quality Assurance Handbook for Rural Roads Volume-I - pmgsy

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

5.2 Tests During Construction<br />

63<br />

<strong>Quality</strong> <strong>Assurance</strong> <strong>Handbook</strong> <strong>for</strong> <strong>Rural</strong> <strong>Roads</strong><br />

TABLE 406.3: QUALITY CONTROL TESTS PRIOR TO CONSTRUCTION<br />

Type of Test Frequency<br />

1. Aggregate Impact Value Test (IS:2386 Part 4) One to two tests on representative sample from each<br />

source identified by the Contractor, depending on<br />

ariability.<br />

2. Flakiness Index Test (IS:2386 Part 1) -do-<br />

3. Water Absorption Test (IS:2386 Part 3) -do-<br />

4. Soundness Test, if the water absorption exceeds 2% -do-<br />

5. Grading Test (IS:2386 Part 1) -do-<br />

6. Atterberg Limits of portion of aggregate passing -do-<br />

425 micron sieve (IS:2720 Part 5)<br />

7. Proctor Compaction Test (IS:2720 Part 7) -do-<br />

(after replacing the aggregate fraction retained<br />

on 22.4 mm sieve with material of 4.75 mm to<br />

22.4 mm size) alongwith Dry Density-Moisture<br />

Content Relationship<br />

The quality control tests to be carried out during construction are indicated in Table 406.4.<br />

Table 406.4: QUALITY CONTROL TESTS DURING CONSTRUCTION<br />

Type of Test Frequency<br />

1. Grading Test (IS:2386 Part 1) Atleast one test per day.<br />

2. Aggregate impact value (IS:2386-Part 4) At random one test per km<br />

3. Placement Moisture Content (IS:2720 Part 2) Atleast three tests per day.<br />

4. Density of Compacted Layer (IS:2720 Part 28) -do-<br />

5. Thickness of Compacted Layer At random<br />

5.3 <strong>Quality</strong> Control Checks by AE/EE<br />

The quality checks by AE/EE are indicated in Table 406.5.<br />

TABLE 406.5: QUALITY CONTROL CHECKS BY AE/EE<br />

Stage Test Frequency Designation of<br />

Inspecting Officer<br />

1. Top of the (i) Density of the (a) One test <strong>for</strong> every 500 m length or part AE<br />

Finished WMM compacted layer there of <strong>for</strong> each layer<br />

Layer (IS:2720 Part 28) (b) One test <strong>for</strong> every 1000 m length or part<br />

thereof <strong>for</strong> each layer EE<br />

(ii) Surface Regularity Random Checking EE<br />

and Transverse<br />

Profile

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!