3. Section-400<br />

5.3 <strong>Quality</strong> Control Checks by AE/EE<br />

The quality control checks to be carried out by the AE/EE are indicated in Table 405.8.<br />

TABLE 405.8 : QUALITY CONTROL CHECKS BY AE/EE<br />

Stage Test Frequency Designation of<br />

Inspecting Officer<br />

1. Top of the (i) <strong>Volume</strong>tric analysis (a) One test <strong>for</strong> each 200 m length of the layer. AE<br />

Finished WBM<br />

Layer<br />

(b) One test <strong>for</strong> each 500 m length of the layer. EE<br />

(ii) Plasticity Index One test <strong>for</strong> each 500 m length of the layer<br />

(mean of two tests)<br />

AE<br />

(iii) Surface Regularity<br />

and Transverse<br />

Profile<br />

Random Checking EE<br />

C Do’s and Don’ts<br />

1. Check aggregates <strong>for</strong> Soundness test when water<br />

absorption is more than 2 percent.<br />

2. Soft aggregate should be tested <strong>for</strong> wet aggregate<br />

impact value.<br />

3. Construct shoulders simultaneously along with<br />

WBM layers.<br />

4. Use inverted choke over fine grained soil sub-grade.<br />

5. Remove BT surface be<strong>for</strong>e WBM is laid on an existing<br />

black top road.<br />

6. Remove defective macadam to full depth and replace<br />

by fresh material and recompact.<br />

406. WET MIX MACADAM BASE<br />

A Methodology<br />

Do’s Don’ts<br />

1. Do not use any material derived from rocks e.g.<br />

phyllites, shales or slates.<br />

2. Do not use local soil and clayey material as screenings<br />

or binding material unless it meats the requirements<br />

of PI mentioned in para B1 (iii).<br />

3. Do not use binding material if screenings are of<br />

crushable type.<br />

4. Do not spread coarse aggregate more than 3 days in<br />

advance of any subsequent operations.<br />

5. Do not roll if sub-grade is soft or yielding or causes a<br />

wave like motion while rolling.<br />

6. Do not lay WBM layer on lime treated sub-base until<br />

it has attained its strength.<br />

7. Do not use screenings to make up depressions.<br />

8. Do not allow traffic till WBM is fully set.<br />

1. The surface to receive Wet Mix Macadam (WMM) shall be prepared as per sub-section 405.<br />

2. WMM shall be prepared in an approved mixing plant with mixing arrangements like the pug mill<br />

or pan type mixer of concrete batching plant. For small quantities of WMM, the Engineer may<br />

permit the use of concrete mixers.<br />

3. Optimum moisture <strong>for</strong> mixing shall be determined in accordance with IS:2720 (Part 7) after replacing<br />

the aggregate fraction retained on 22.4 mm sieve with material of 4.75 mm to 22.4 mm size.<br />