5.3 <strong>Quality</strong> Control Checks by AE/EE<br />
The quality control checks to be carried out by the AE/EE are indicated in Table 405.8.<br />
TABLE 405.8 : QUALITY CONTROL CHECKS BY AE/EE<br />
Stage Test Frequency Designation of<br />
Inspecting Officer<br />
1. Top of the (i) <strong>Volume</strong>tric analysis (a) One test <strong>for</strong> each 200 m length of the layer. AE<br />
Finished WBM<br />
Layer<br />
(b) One test <strong>for</strong> each 500 m length of the layer. EE<br />
(ii) Plasticity Index One test <strong>for</strong> each 500 m length of the layer<br />
(mean of two tests)<br />
AE<br />
(iii) Surface Regularity<br />
and Transverse<br />
Profile<br />
Random Checking EE<br />
C Do’s and Don’ts<br />
1. Check aggregates <strong>for</strong> Soundness test when water<br />
absorption is more than 2 percent.<br />
2. Soft aggregate should be tested <strong>for</strong> wet aggregate<br />
impact value.<br />
3. Construct shoulders simultaneously along with<br />
WBM layers.<br />
4. Use inverted choke over fine grained soil sub-grade.<br />
5. Remove BT surface be<strong>for</strong>e WBM is laid on an existing<br />
black top road.<br />
6. Remove defective macadam to full depth and replace<br />
by fresh material and recompact.<br />
406. WET MIX MACADAM BASE<br />
A Methodology<br />
Do’s Don’ts<br />
1. Do not use any material derived from rocks e.g.<br />
phyllites, shales or slates.<br />
2. Do not use local soil and clayey material as screenings<br />
or binding material unless it meats the requirements<br />
of PI mentioned in para B1 (iii).<br />
3. Do not use binding material if screenings are of<br />
crushable type.<br />
4. Do not spread coarse aggregate more than 3 days in<br />
advance of any subsequent operations.<br />
5. Do not roll if sub-grade is soft or yielding or causes a<br />
wave like motion while rolling.<br />
6. Do not lay WBM layer on lime treated sub-base until<br />
it has attained its strength.<br />
7. Do not use screenings to make up depressions.<br />
8. Do not allow traffic till WBM is fully set.<br />
1. The surface to receive Wet Mix Macadam (WMM) shall be prepared as per sub-section 405.<br />
2. WMM shall be prepared in an approved mixing plant with mixing arrangements like the pug mill<br />
or pan type mixer of concrete batching plant. For small quantities of WMM, the Engineer may<br />
permit the use of concrete mixers.<br />
3. Optimum moisture <strong>for</strong> mixing shall be determined in accordance with IS:2720 (Part 7) after replacing<br />