For use in base course, the Liquid limit and Plasticity Index shall not exceed 45% and 20%<br />

respectively.<br />

(ii) Cement: Cement shall comply with the requirements of IS:269, 455 or 1489<br />

(iii) Lime: (If needed <strong>for</strong> pretreatment) as per Sub-section 403.<br />

(iv) Water: The water <strong>for</strong> cement stabilization shall be clean and free from injurious substances.<br />

2. Horizontal Alignment<br />

The edges of the cement stabilized soil layer should be correct within a tolerance limit of (±) 30<br />

mm in plain and rolling terrains and (± )50 mm in hilly terrain.<br />

3. Surface Levels<br />

The tolerance in surface levels <strong>for</strong> cement treated soil sub-base will be restricted to (+) 10 mm and<br />

(–) 20 mm while <strong>for</strong> cement-treated soil base, it will be restricted to (±) 10 mm. A grid of 10 m x 2.5<br />

m may be <strong>for</strong>med to check the surface levels.<br />

4. Surface Regularity<br />

The maximum permitted difference between the cement stabilized soil layer and 3 m straight<br />

edge shall be 12 mm <strong>for</strong> longitudinal profile and 10 mm <strong>for</strong> cross profile.<br />

5. Minimum Compressive Strength<br />

For use in base and sub-base courses, minimum 7-day unconfined compressive strength of 2.76<br />

MPa and 1.7 MPa respectively is required.<br />

6. QUALITY CONTROL TESTS<br />

6.1 Tests Prior to Construction<br />

The quality control tests to be carried out prior to construction are indicated in Table 404.2.<br />

Table 404.2 : QUALITY CONTROL TESTS PRIOR TO CONSTRUCTION<br />

Type of Test Frequency<br />

1. <strong>Quality</strong> of cement and Purity of Lime (IS:1514) One test <strong>for</strong> each lot<br />

(if used <strong>for</strong> pre-treatment)<br />

2. Unconfined Compressive Strength Test One test on a set of 3 specimens per km length.<br />

(IS:4332 Part 5)<br />

6.2 Tests During Construction<br />

The quality control tests to be carried out during construction are indicated in Table 404.3.