3. Section-300<br />
TABLE 306.1 THICKNESS OF LAYER FOR FLYASH EMBANKMENT CONSTRUCTION<br />
Thickness of Layer Weight of static roller Weight of vibratory roller<br />
(loose) in mm used in kN used in kN<br />
Not exceeding 200 80 to 100<br />
Not exceeding 400 80 to 100<br />
250 60 to 80<br />
100 to 150 10 to 15<br />
5. Moisture content of fill material be<strong>for</strong>e commencement of compaction, shall be within (±) 2% of<br />
the optimum moisture content when determined as per IS:2720 (Part-7). Moisture content of the<br />
cover soil shall be maintained at OMC.<br />
6. If water is required to be added to the fill material, the same shall be sprinkled from a water<br />
bowser without flooding. The water shall be mixed thoroughly by blading, discing or harrowing.<br />
7. Compaction of flyash should start as early as possible after spreading. Each layer of flyash shall<br />
be thoroughly compacted to the specified density. When vibratory roller is used <strong>for</strong> compaction,<br />
two passes without vibration followed by 5 to 8 passes with vibration shall normally be sufficient<br />
to compact each layer.<br />
8. The compaction of flyash core and earth cover on the sides shall proceed simultaneously. After<br />
construction, flyash embankment shall con<strong>for</strong>m to the following:<br />
(i) Minimum dry density after compaction as percentage of<br />
maximum dry density determined as per IS 2720 (Part-7) 98%<br />
(ii) Minimum dry density after compaction, when used in<br />
bridge abutments <strong>for</strong> embankment length equal to 1.5<br />
times the height of the embankment, as percentage of<br />
maximum dry density determined as per IS 2720 (Part 7) 100%<br />
9. On the top of flyash embankment, at least 500 mm thick selected earth embankment shall be<br />
provided, out of which top 300 mm shall be sub-grade as per sub-section 303.<br />
10. Following precautions should be taken while handling flyash:<br />
(i) Flyash (Pond Ash) should be delivered to site in covered dumper trucks to minimize loss of<br />
moisture and dusting preferably during night.<br />
(ii) Stockpiling of flyash at site should be avoided.<br />
(iii) If stockpiling at site cannot be avoided, dusting shall be prevented by spraying water on<br />
stockpiles at regular intervals and by keeping the stockpile covered with tarpaulin or a thin<br />
layer of material not subject to dusting e.g. soil or granular material.<br />
(iv) Traffic should be restricted in areas where flyash is temporarily stockpiled at site.<br />