3. Section-300<br />

TABLE 306.1 THICKNESS OF LAYER FOR FLYASH EMBANKMENT CONSTRUCTION<br />

Thickness of Layer Weight of static roller Weight of vibratory roller<br />

(loose) in mm used in kN used in kN<br />

Not exceeding 200 80 to 100<br />

Not exceeding 400 80 to 100<br />

250 60 to 80<br />

100 to 150 10 to 15<br />

5. Moisture content of fill material be<strong>for</strong>e commencement of compaction, shall be within (±) 2% of<br />

the optimum moisture content when determined as per IS:2720 (Part-7). Moisture content of the<br />

cover soil shall be maintained at OMC.<br />

6. If water is required to be added to the fill material, the same shall be sprinkled from a water<br />

bowser without flooding. The water shall be mixed thoroughly by blading, discing or harrowing.<br />

7. Compaction of flyash should start as early as possible after spreading. Each layer of flyash shall<br />

be thoroughly compacted to the specified density. When vibratory roller is used <strong>for</strong> compaction,<br />

two passes without vibration followed by 5 to 8 passes with vibration shall normally be sufficient<br />

to compact each layer.<br />

8. The compaction of flyash core and earth cover on the sides shall proceed simultaneously. After<br />

construction, flyash embankment shall con<strong>for</strong>m to the following:<br />

(i) Minimum dry density after compaction as percentage of<br />

maximum dry density determined as per IS 2720 (Part-7) 98%<br />

(ii) Minimum dry density after compaction, when used in<br />

bridge abutments <strong>for</strong> embankment length equal to 1.5<br />

times the height of the embankment, as percentage of<br />

maximum dry density determined as per IS 2720 (Part 7) 100%<br />

9. On the top of flyash embankment, at least 500 mm thick selected earth embankment shall be<br />

provided, out of which top 300 mm shall be sub-grade as per sub-section 303.<br />

10. Following precautions should be taken while handling flyash:<br />

(i) Flyash (Pond Ash) should be delivered to site in covered dumper trucks to minimize loss of<br />

moisture and dusting preferably during night.<br />

(ii) Stockpiling of flyash at site should be avoided.<br />

(iii) If stockpiling at site cannot be avoided, dusting shall be prevented by spraying water on<br />

stockpiles at regular intervals and by keeping the stockpile covered with tarpaulin or a thin<br />

layer of material not subject to dusting e.g. soil or granular material.<br />

(iv) Traffic should be restricted in areas where flyash is temporarily stockpiled at site.<br />

36