Quality Assurance Handbook for Rural Roads Volume-I - pmgsy

Quality Assurance Handbook for Rural Roads Volume-I - pmgsy Quality Assurance Handbook for Rural Roads Volume-I - pmgsy

18.08.2013 Views

FOREWORD PREFACE ABBREVIATIONS QUALITY ASSURANCE HANDBOOK FOR RURAL ROADS PAGE NO. CHAPTER 1 INTRODUCTION 1 to 5 CHAPTER 2 QUALITY MANAGEMENT SYSTEM 7 to 10 CHAPTER 3 QUALITY CONTROL OF WORKS Section 100 GENERAL 13 to 15 105 Construction Equipment 108 Setting Out 109&110 Public Utilities and Environment 114 Methodology & Sequence of Work Section 200 SITE CLEARANCE 201& 202 Site Clearance 19 Section 300 EARTHWORKS 23 to 38 301 Embankment Construction 302 Earthwork in Cutting 303 Subgrade Construction 304 Rock Cutting 306 Flyash Embankment Construction 307 Surface Drains VOLUME I CONTENTS Section 400 GRANULAR SUB-BASES, BASES & SURFACINGS 41 to 79 401 Granular Sub-Base III

402 Gravel/Soil-Aggregates Base & Surface Course 403 Lime Treated Soil for Improved Subgrade/Sub-base 404 Cement Treated Soil Sub-Base/Base 405 Water Bound Macadam Sub-Base/Base/Surfacing 406 Wet Mix Macadam Base 407 Shoulder Construction 408 Local Materials for Road Construction 409 Lime-Flyash Stabilised Soil Sub-Base 410 Industrial Wastes for Road Construction 411 Crusher-Run Macadam Base 412 Brick Soling 413 Stone Set Pavement Section 500 BITUMINOUS CONSTRUCTION 83 to 120 501 Preparation of Surface 502 Prime Coat Over Granular Base 503 Tack Coat 504 Bituminous Macadam 505 Built-Up Spray Grout 506 Modified Penetration Macadam 507 Surface Dressing 508 20 mm Thick Premix Carpet 509 Mix Seal Surfacing 510 Seal Coat 512 Modified Bitumen Section 600 BRICK WORK FOR STRUCTURES 123 to 128 Section 700 STONE MASONRY FOR STRUCTURES 131 to 136 Section 800 CONCRETE FOR STRUCTURES 139 to 147 Section 900 FORMWORK AND SURFACE FINISH FOR STRUCTURES 151 to 154 Section 1000 STEEL REINFORCEMENT 157 to 159 IV

FOREWORD<br />

PREFACE<br />

ABBREVIATIONS<br />

QUALITY ASSURANCE HANDBOOK FOR RURAL ROADS<br />

PAGE NO.<br />

CHAPTER 1 INTRODUCTION 1 to 5<br />

CHAPTER 2 QUALITY MANAGEMENT SYSTEM 7 to 10<br />

CHAPTER 3 QUALITY CONTROL OF WORKS<br />

Section 100 GENERAL 13 to 15<br />

105 Construction Equipment<br />

108 Setting Out<br />

109&110 Public Utilities and Environment<br />

114 Methodology & Sequence of Work<br />

Section 200 SITE CLEARANCE<br />

201& 202 Site Clearance 19<br />

Section 300 EARTHWORKS 23 to 38<br />

301 Embankment Construction<br />

302 Earthwork in Cutting<br />

303 Subgrade Construction<br />

304 Rock Cutting<br />

306 Flyash Embankment Construction<br />

307 Surface Drains<br />

VOLUME I<br />

CONTENTS<br />

Section 400 GRANULAR SUB-BASES, BASES & SURFACINGS 41 to 79<br />

401 Granular Sub-Base<br />

III

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!