3. Section-300<br />
6.3 <strong>Quality</strong> Control Checks by AE/EE<br />
C. Do’s and Don’ts<br />
Do’s Don’ts<br />
1. Discourage borrow pits along the road; where<br />
permitted, ridges of minimum 8 m width should be<br />
left at intervals not exceeding 300 m. Small drains<br />
should be cut through the ridges to facilitate<br />
drainage.<br />
2. The depth of borrow pits should be so regulated that<br />
their bottom does not cut an imaginary line having<br />
a slope of 1 vertical to 4 horizontal projected from<br />
the edge of the final section of the bank, the<br />
maximum depth in any case being limited to 1.0 m.<br />
3. Do maintain a camber/ cross fall of 4 percent during<br />
construction <strong>for</strong> effective drainage and prevention<br />
of ponding of water.<br />
4. The area of the embankment foundation should be<br />
kept dry. Test the material (soil) <strong>for</strong> its suitability<br />
<strong>for</strong> use in the embankment at least seven days be<strong>for</strong>e<br />
commencement of earthwork. Tests should include<br />
soil. classification test data and data regarding<br />
maximum dry density, OMC, and CBR (soaked and<br />
unsoaked).<br />
5. For widening of existing embankment start earth<br />
work from toe line.<br />
TABLE 301.6 : QUALITY CONTROL CHECKS BY AE/EE<br />
Stage Test Frequency Designation of<br />
Inspecting Officer<br />
A. Top of the (i) Degree of Minimum 3 tests <strong>for</strong> each km length or part AE<br />
Embankment Compaction thereof; allowable tolerance in test values as<br />
(Be<strong>for</strong>e placing (IS:2720 Part 28) per para 6.2. One of the tests shall be carried<br />
Subgrade Layer) out at a depth of 150 mm from the top.<br />
(ii) Surface Regularity<br />
and Transverse<br />
Profile<br />
Random Checking AE<br />
B. Finished (i) Degree of (a) One test <strong>for</strong> each 300 m length or AE<br />
Subgrade compaction<br />
(IS:2720 Part 28)<br />
part thereof.<br />
(b) One test <strong>for</strong> each 1000 m length or<br />
part thereof. One of the tests shall be<br />
carried out at a depth of 150 mm<br />
from the top.<br />
EE<br />
(ii) Surface Regularity<br />
and Transverse<br />
Profile/camber/<br />
crossfall and<br />
superelevation<br />
Random Checking EE<br />
1. Do not allow borrow pits within a distance equal to<br />
the height of the embankment subject to a minimum<br />
of 1.5 m from the toe of the road embankment.<br />
2. Do not allow borrow pits within 800 m of towns or<br />
villages.<br />
3. Do not use unsuitable material <strong>for</strong> embankment<br />
construction (Refer para B.1).<br />
4. Do not allow construction or other vehicular traffic<br />
over the prepared surface of embankment/ sub-grade.<br />
5. Do not place successive layers of embankment until<br />
the previous layer has been thoroughly compacted and<br />
duly approved by Engineer.<br />
6. Do not allow any damage to works, crops or other<br />
property while discharging stagnant water found in<br />
embankment foundation.<br />
7. Do not allow dumping of earth from top to widen an<br />
existing embankment.<br />