3. Section-300<br />

6.3 <strong>Quality</strong> Control Checks by AE/EE<br />

C. Do’s and Don’ts<br />

Do’s Don’ts<br />

1. Discourage borrow pits along the road; where<br />

permitted, ridges of minimum 8 m width should be<br />

left at intervals not exceeding 300 m. Small drains<br />

should be cut through the ridges to facilitate<br />

drainage.<br />

2. The depth of borrow pits should be so regulated that<br />

their bottom does not cut an imaginary line having<br />

a slope of 1 vertical to 4 horizontal projected from<br />

the edge of the final section of the bank, the<br />

maximum depth in any case being limited to 1.0 m.<br />

3. Do maintain a camber/ cross fall of 4 percent during<br />

construction <strong>for</strong> effective drainage and prevention<br />

of ponding of water.<br />

4. The area of the embankment foundation should be<br />

kept dry. Test the material (soil) <strong>for</strong> its suitability<br />

<strong>for</strong> use in the embankment at least seven days be<strong>for</strong>e<br />

commencement of earthwork. Tests should include<br />

soil. classification test data and data regarding<br />

maximum dry density, OMC, and CBR (soaked and<br />

unsoaked).<br />

5. For widening of existing embankment start earth<br />

work from toe line.<br />

TABLE 301.6 : QUALITY CONTROL CHECKS BY AE/EE<br />

Stage Test Frequency Designation of<br />

Inspecting Officer<br />

A. Top of the (i) Degree of Minimum 3 tests <strong>for</strong> each km length or part AE<br />

Embankment Compaction thereof; allowable tolerance in test values as<br />

(Be<strong>for</strong>e placing (IS:2720 Part 28) per para 6.2. One of the tests shall be carried<br />

Subgrade Layer) out at a depth of 150 mm from the top.<br />

(ii) Surface Regularity<br />

and Transverse<br />

Profile<br />

Random Checking AE<br />

B. Finished (i) Degree of (a) One test <strong>for</strong> each 300 m length or AE<br />

Subgrade compaction<br />

(IS:2720 Part 28)<br />

part thereof.<br />

(b) One test <strong>for</strong> each 1000 m length or<br />

part thereof. One of the tests shall be<br />

carried out at a depth of 150 mm<br />

from the top.<br />

EE<br />

(ii) Surface Regularity<br />

and Transverse<br />

Profile/camber/<br />

crossfall and<br />

superelevation<br />

Random Checking EE<br />

1. Do not allow borrow pits within a distance equal to<br />

the height of the embankment subject to a minimum<br />

of 1.5 m from the toe of the road embankment.<br />

2. Do not allow borrow pits within 800 m of towns or<br />

villages.<br />

3. Do not use unsuitable material <strong>for</strong> embankment<br />

construction (Refer para B.1).<br />

4. Do not allow construction or other vehicular traffic<br />

over the prepared surface of embankment/ sub-grade.<br />

5. Do not place successive layers of embankment until<br />

the previous layer has been thoroughly compacted and<br />

duly approved by Engineer.<br />

6. Do not allow any damage to works, crops or other<br />

property while discharging stagnant water found in<br />

embankment foundation.<br />

7. Do not allow dumping of earth from top to widen an<br />

existing embankment.<br />

28