- Page 2 and 3:
Ministry of Rural Development Gover
- Page 4 and 5:
FOREWORD PREFACE ABBREVIATIONS QUAL
- Page 6 and 7:
Section 1100 PIPE CULVERTS 163 to 1
- Page 8 and 9:
PREFACE A good road network has an
- Page 10 and 11:
AE : Assistant Engineer AIV : Aggre
- Page 12 and 13:
1. BACKGROUND 1 Quality Assurance H
- Page 14 and 15:
3 Quality Assurance Handbook for Ru
- Page 16 and 17:
Material tests Workmanship tests Se
- Page 18 and 19:
2. Quality Management System (iii)
- Page 20 and 21:
2. Quality Management System A typi
- Page 22 and 23:
105. CONSTRUCTION EQUIPMENT 13 Qual
- Page 24 and 25:
B Do’s and Don’ts Do’s Don’
- Page 26 and 27:
201 & 202. SITE CLEARANCE A Methodo
- Page 28 and 29:
301. EMBANKMENT CONSTRUCTION A Meth
- Page 30 and 31:
(vii) Materials in a frozen conditi
- Page 32 and 33:
B. Earthwork for Subgrade (Cutting
- Page 34 and 35:
302. EARTHWORK IN CUTTING A. Method
- Page 36 and 37:
31 Quality Assurance Handbook for R
- Page 38 and 39:
33 Quality Assurance Handbook for R
- Page 40 and 41:
35 Quality Assurance Handbook for R
- Page 42 and 43:
B. Quality Control Requirements 1.
- Page 44 and 45:
SECTION 400 39 Quality Assurance Ha
- Page 46 and 47:
3. Section-400 (ii) Atterberg limit
- Page 48 and 49:
3. Section-400 C Do’s and Don’t
- Page 50 and 51:
3. Section-400 TABLE 402.2: GRADING
- Page 52 and 53:
3. Section-400 2. The pulverization
- Page 54 and 55:
3. Section-400 Table 403.3 : QUALIT
- Page 56 and 57:
3. Section-400 6. The cement stabil
- Page 58 and 59:
3. Section-400 6.3 Quality Control
- Page 60 and 61:
3. Section-400 14. In case the scre
- Page 62 and 63:
3. Section-400 TABLE 405.4: APPROXI
- Page 64 and 65:
3. Section-400 5.3 Quality Control
- Page 66 and 67:
3. Section-400 (ii) Grading Require
- Page 68 and 69:
3. Section-400 C Do’s and Don’t
- Page 70 and 71:
3. Section-400 408. Local materials
- Page 72 and 73:
3. Section-400 B. Quality control r
- Page 74 and 75:
3. Section-400 409. LIME-FLYASH STA
- Page 76 and 77:
3. Section-400 4. Surface Regularit
- Page 78 and 79:
3. Section-400 (ii) Slag The broad
- Page 80 and 81:
3. Section-400 6. The thickness of
- Page 82 and 83:
3. Section-400 2. Horizontal Alignm
- Page 84 and 85:
SECTION 500 BITUMINOUS 81 Quality A
- Page 86 and 87:
3. Section-500 (iii) In the final l
- Page 88 and 89:
3. Section-500 3. The primer should
- Page 90 and 91:
3. Section-500 B. Quality Control R
- Page 92 and 93:
3. Section-500 TABLE 504.2: PHYSICA
- Page 94 and 95:
3. Section-500 5.3 Quality Control
- Page 96 and 97:
3. Section-500 (b) Bitumen The bind
- Page 98 and 99:
3. Section-500 TABLE 506.1 RATE OF
- Page 100 and 101:
3. Section-500 TABLE 507.1: NOMINAL
- Page 102 and 103:
3. Section-500 5. Quality Control T
- Page 104 and 105:
3. Section-500 TABLE 508.1.1 : QUAN
- Page 106 and 107:
3. Section-500 Table 508.1.3: QUALI
- Page 108 and 109:
3. Section-500 B. Quality Control R
- Page 110 and 111:
3. Section-500 (ii) Immediately the
- Page 112 and 113:
3. Section-500 512. MODIFIED BITUME
- Page 114 and 115:
3. Section-500 TABLE 512.5 : REQUIR
- Page 116 and 117:
Annex-III & IV DETERMINATION OF IN-
- Page 118 and 119:
SIMPLE/HANDFEEL TESTS 600 600.1 Bri
- Page 120 and 121:
119 Quality Assurance Handbook for
- Page 122 and 123:
SECTION 600 121 Quality Assurance H
- Page 124 and 125:
3. Section-600 4. Build the courses
- Page 126 and 127:
3. Section-600 (v) Storage of mater
- Page 128 and 129:
3. Section-600 3.3. Quality Control
- Page 130 and 131:
700 : STONE MASONRY FOR STRUCTURES
- Page 132 and 133:
(v) Stone Masonry 133 Quality Assur
- Page 134 and 135:
4.2. Tests / checks during construc
- Page 136 and 137:
SECTION 800 CONCRETE FOR STRUCTURES
- Page 138 and 139:
3. Section-800 2. Proceed with conc
- Page 140 and 141:
3. Section-800 TABLE 800.3: REQUIRE
- Page 142 and 143:
3. Section-800 c. The strength of a
- Page 144 and 145:
3. Section-800 4.2 Tests / checks d
- Page 146 and 147:
SECTION 900 149 Quality Assurance H
- Page 148 and 149:
3. Section-900 2. Lower centering g
- Page 150 and 151:
3. Section-900 C. Do’s and Don’
- Page 152 and 153:
1000 STEEL REINFORCEMENT A. Methodo
- Page 154 and 155:
3.2 Tests during construction 159 Q
- Page 156 and 157:
1100: PIPE CULVERTS A. Methodology
- Page 158 and 159:
165 Quality Assurance Handbook for
- Page 160 and 161:
SECTION 1200 167 Quality Assurance
- Page 162 and 163:
3. Section-1200 A2 Substructures Th
- Page 164 and 165:
3. Section-1200 4. Provide 75 mm ce
- Page 166 and 167:
3. Section-1200 (2) Tolerances 1200
- Page 168 and 169:
3. Section-1200 3.2 Tests / checks
- Page 170 and 171:
SECTION 1300 179 Quality Assurance
- Page 172 and 173:
3. Section-1300 A-3 Toe Protection
- Page 174 and 175:
3. Section-1300 2. Stones for pitch
- Page 176 and 177:
SECTION 1400 187 Quality Assurance
- Page 178 and 179:
3. Section-1400 3. Give streamline
- Page 180 and 181:
3. Section-1400 2. Tests during con
- Page 182 and 183:
SECTION 1500 195 Quality Assurance
- Page 184 and 185:
3. Section-1500 5 Mark location and
- Page 186 and 187:
3. Section-1500 (iv) Water Water us
- Page 188 and 189:
3. Section-1500 TABLE 1501.3: QUALI
- Page 190 and 191:
3. Section-1500 2. Check the in-sit
- Page 192 and 193:
3. Section-1500 TABLE NO. 1502.3: P
- Page 194 and 195:
3. Section-1500 1503: RECTANGULAR C
- Page 196 and 197: 3. Section-1500 3.2 Tests during co
- Page 198 and 199: 3. Section-1500 1504: INTERLOCKING
- Page 200 and 201: 3. Section-1500 2. Quality Control
- Page 202 and 203: SECTION 1600 217 Quality Assurance
- Page 204 and 205: 3. Section-1600 The prescribed road
- Page 206 and 207: 3. Section-1600 C. Do’s and Don
- Page 208 and 209: 1700. TRAFFIC SIGNS AND MARKINGS A.
- Page 210 and 211: 227 Quality Assurance Handbook for
- Page 212 and 213: 231 Quality Assurance Handbook for
- Page 214 and 215: 1904 : MAINTENANCE OF BITUMINOUS SU
- Page 216 and 217: 4.6 Settlement and Upheaval 235 Qua
- Page 218 and 219: 2. Surface Finish 237 Quality Assur
- Page 220 and 221: 1908 : MAINTENANCE OF CULVERTS AND
- Page 222 and 223: 241 Quality Assurance Handbook for
- Page 224 and 225: 4. Quality Monitoring only in excep
- Page 226 and 227: 1. SECTION 100: GENERAL 1.1: Qualit
- Page 228 and 229: 249 Quality Assurance Handbook for
- Page 230 and 231: 10 5R 60 106 25 DIA WELDED 21 DIA 1
- Page 232 and 233: 4. Section-300 (b) Carry out an ins
- Page 234 and 235: 4. Section-300 Photo 1. Visual Clas
- Page 236 and 237: 259 Quality Assurance Handbook for
- Page 238 and 239: Test 1 261 Quality Assurance Handbo
- Page 240 and 241: 4. Section-500 (iii) Check the aggr
- Page 242 and 243: 5. SECTION 1100:PIPE CULVERTS 267 Q
- Page 244 and 245: 6. SECTION 1300: PROTECTION WORKS A
- Page 248 and 249: 4. Section-1700 2. Road Markings C
- Page 250 and 251: Appendix-1 1.4 Estimating Plasticit
- Page 252 and 253: Appendix-1 1.8 Simple Gadgets for E
- Page 254 and 255: Appendix-1 (ii) Make two identical
- Page 256 and 257: Appendix-1 (ii) Workability: Take a
- Page 258 and 259: Appendix-2 Curing : Covering the c
- Page 260 and 261: Appendix-3 Sr. Code/ Title of the P
- Page 262 and 263: Appendix-3 Sr. Code/ Title of the P
- Page 264 and 265: Appendix-3 Sr. Code/ Title of the P
- Page 266 and 267: Quality Assurance Handbook for Rura