Quality Assurance Handbook for Rural Roads Volume-I - pmgsy
Quality Assurance Handbook for Rural Roads Volume-I - pmgsy Quality Assurance Handbook for Rural Roads Volume-I - pmgsy
5. SECTION 1100:PIPE CULVERTS 267 Quality Assurance Handbook for Rural Roads SECTION 1200: R.C.C SLAB CULVERTS AND MINOR BRIDGES SECTION 1400: CEMENT CONCRETE CAUSEWAYS AND SUBMERSIBLE BRIDGES 5.1 Cross Drainage Works 1. Quality of Materials (i) Check from the registers of quality control tests, the results of tests on constituents of cement concrete (coarse and fine aggregates, water and setting time of cement), steel reinforcement, bricks and stones etc. (ii) Check the test results on 7 day/ 28 day strength as per Specifications of concrete and workability of fresh concrete (Slump test) etc. during construction. (iii) Check the Manufacturers’ Certificates for the physical and chemical test results on cement, test results on concrete/ hume pipes, bearings and plasticizers where used, sealants etc. 2. Quality of Workmanship (i) In ongoing projects, check on the time for removal of formwork. (ii) Check for any damage to concrete members due to settlement of support system. (iii) Check visually for any honeycombing in concrete. (iv) For Pipe Culverts: Check the dia of pipes and defects, if any Check for inlet and outlet gradients of pipes Check clear spacing between rows of pipes Check the thickness of earth cushion over pipes Check for plumbness in head Walls/ Return Walls. Check dimensions for bedding of pipes. (v) Slab Culverts/ Minor Bridges Check the deck slab for depth and width of carriageway, overall length/ length between bearings, and camber. Where quality of any concrete member is in doubt, check for soundness of concrete after hardening by striking with a 0.5 kg hammer or Schmidt’s Rebound Hammer. Check the Railings/ Kerbs/ Parapets for the specified dimensions and irregularities in alignment.
4. Section-1100, 1200 & 1400 (vi) Protective Works: Check on the size and spacing of weep holes, where applicable. Check on the size of boulders, wire crates, length/ thickness as may be applicable. Check for any signs of soil erosion. Check the length of apron. (vii) Cement Concrete Causeway Check the provision of guard stones, guide posts, warning signs and flood gauges. Check the adequacy of vents (their number and spacing). Check that the approaches are in cutting. Check whether road crust has been provided in the entire width of the approaches. (viii) Submersible Bridges Check the provision of anchorages to deck slab with piers/abutments. Check the provision of rounded/streamlined chamfers to all concrete elements. Check provisions of steps in slope pitching for inspection of submersible bridges 268
- Page 192 and 193: 3. Section-1500 TABLE NO. 1502.3: P
- Page 194 and 195: 3. Section-1500 1503: RECTANGULAR C
- Page 196 and 197: 3. Section-1500 3.2 Tests during co
- Page 198 and 199: 3. Section-1500 1504: INTERLOCKING
- Page 200 and 201: 3. Section-1500 2. Quality Control
- Page 202 and 203: SECTION 1600 217 Quality Assurance
- Page 204 and 205: 3. Section-1600 The prescribed road
- Page 206 and 207: 3. Section-1600 C. Do’s and Don
- Page 208 and 209: 1700. TRAFFIC SIGNS AND MARKINGS A.
- Page 210 and 211: 227 Quality Assurance Handbook for
- Page 212 and 213: 231 Quality Assurance Handbook for
- Page 214 and 215: 1904 : MAINTENANCE OF BITUMINOUS SU
- Page 216 and 217: 4.6 Settlement and Upheaval 235 Qua
- Page 218 and 219: 2. Surface Finish 237 Quality Assur
- Page 220 and 221: 1908 : MAINTENANCE OF CULVERTS AND
- Page 222 and 223: 241 Quality Assurance Handbook for
- Page 224 and 225: 4. Quality Monitoring only in excep
- Page 226 and 227: 1. SECTION 100: GENERAL 1.1: Qualit
- Page 228 and 229: 249 Quality Assurance Handbook for
- Page 230 and 231: 10 5R 60 106 25 DIA WELDED 21 DIA 1
- Page 232 and 233: 4. Section-300 (b) Carry out an ins
- Page 234 and 235: 4. Section-300 Photo 1. Visual Clas
- Page 236 and 237: 259 Quality Assurance Handbook for
- Page 238 and 239: Test 1 261 Quality Assurance Handbo
- Page 240 and 241: 4. Section-500 (iii) Check the aggr
- Page 244 and 245: 6. SECTION 1300: PROTECTION WORKS A
- Page 246 and 247: 4. Section-1500 In case of cracked
- Page 248 and 249: 4. Section-1700 2. Road Markings C
- Page 250 and 251: Appendix-1 1.4 Estimating Plasticit
- Page 252 and 253: Appendix-1 1.8 Simple Gadgets for E
- Page 254 and 255: Appendix-1 (ii) Make two identical
- Page 256 and 257: Appendix-1 (ii) Workability: Take a
- Page 258 and 259: Appendix-2 Curing : Covering the c
- Page 260 and 261: Appendix-3 Sr. Code/ Title of the P
- Page 262 and 263: Appendix-3 Sr. Code/ Title of the P
- Page 264 and 265: Appendix-3 Sr. Code/ Title of the P
- Page 266 and 267: Quality Assurance Handbook for Rura
5. SECTION 1100:PIPE CULVERTS<br />
267<br />
<strong>Quality</strong> <strong>Assurance</strong> <strong>Handbook</strong> <strong>for</strong> <strong>Rural</strong> <strong>Roads</strong><br />
SECTION 1200: R.C.C SLAB CULVERTS AND MINOR BRIDGES<br />
SECTION 1400: CEMENT CONCRETE CAUSEWAYS<br />
AND SUBMERSIBLE BRIDGES<br />
5.1 Cross Drainage Works<br />
1. <strong>Quality</strong> of Materials<br />
(i) Check from the registers of quality control tests, the results of tests on constituents of cement<br />
concrete (coarse and fine aggregates, water and setting time of cement), steel rein<strong>for</strong>cement,<br />
bricks and stones etc.<br />
(ii) Check the test results on 7 day/ 28 day strength as per Specifications of concrete and<br />
workability of fresh concrete (Slump test) etc. during construction.<br />
(iii) Check the Manufacturers’ Certificates <strong>for</strong> the physical and chemical test results on cement,<br />
test results on concrete/ hume pipes, bearings and plasticizers where used, sealants etc.<br />
2. <strong>Quality</strong> of Workmanship<br />
(i) In ongoing projects, check on the time <strong>for</strong> removal of <strong>for</strong>mwork.<br />
(ii) Check <strong>for</strong> any damage to concrete members due to settlement of support system.<br />
(iii) Check visually <strong>for</strong> any honeycombing in concrete.<br />
(iv) For Pipe Culverts:<br />
Check the dia of pipes and defects, if any<br />
Check <strong>for</strong> inlet and outlet gradients of pipes<br />
Check clear spacing between rows of pipes<br />
Check the thickness of earth cushion over pipes<br />
Check <strong>for</strong> plumbness in head Walls/ Return Walls.<br />
Check dimensions <strong>for</strong> bedding of pipes.<br />
(v) Slab Culverts/ Minor Bridges<br />
Check the deck slab <strong>for</strong> depth and width of carriageway, overall length/ length between<br />
bearings, and camber.<br />
Where quality of any concrete member is in doubt, check <strong>for</strong> soundness of concrete<br />
after hardening by striking with a 0.5 kg hammer or Schmidt’s Rebound Hammer.<br />
Check the Railings/ Kerbs/ Parapets <strong>for</strong> the specified dimensions and irregularities<br />
in alignment.